Colerain and Eleven Minutes to Mayday: Lessons from 2008 Resonate Today

No comments

Remembering the Sacrafice: Capt. Broxterman and FF Schira

On Friday, April 4, 2008 at 06:13:02 hours, what began as a routine response for Colerain Township Fire and EMS Engine 102 to investigate a fire alarm activation at 5708 Squirrels nest Lane, Colerain Township, Ohio resulted in the deaths of Colerain Township Captain Robin Broxterman and Firefighter Brian Schira.

Upon their arrival at the scene of the two-story wood framed, residential building working fire conditions existed in the basement. The initial attack team consisted of Broxterman, Schira, and one other firefighter. The team advanced a 1¾-inch attack hose line through the interior of the building for fire control.

Even though, they were provided with some of the most technologically advanced protective clothing for structural firefighting and self-contained breathing apparatus, it appeared that Broxterman and Schira were overwhelmed by severe fire conditions in the basement. 

During their attempt to evacuate the building, the main-level family room flooring system in which the two were traveling on collapsed into the basement trapping the firefighters. Eleven minutes elapsed from time of arrival to the catastrophic chain of events.

This is one of those distinctive reports that has influential and critical operational, training and preparedness elements embedded throughout the report. 

It’s apparent there continues to be common threads shared by this event from 2008 and other events and incidents in the past five years where a single of multiple firefighters have lost their lives due to similarities in the apparent and common cause deficiencies and short comings identified.

All company and command officers should read and comprehend the lessons learned. Then, take these new found insights and see what the gaps are at the personal level (yours or those you supervise) as well as the shift, group, station, battalion, division or department as a whole.

If there are gaps, then identify a way to implement timely changes as necessary so there are No History Repeating (HRE) events.

The importance of Reading the Building, taking the time to complete the three sixty and being combat ready and “expecting fire”.

Remember their sacrifice, so we can learn.

 

  • Past Post on CommandSafety.com with Report Narrative and Incident Details HERE

 

The following factors were believed to have directly contributed to the deaths of Captain Broxterman and Firefighter Schira:

  • A delayed arrival at the incident scene that allowed the fire to progress significantly;
  • A failure to adhere to fundamental firefighting practices; and
  • A failure to abide by fundamental firefighter self-rescue and survival concepts

 Although the aforementioned factors were believed to have directly contributed to their deaths, they might have been prevented if:

  • Some personnel had not been complacent or apathetic in their initial approach to this incident;
  • Some personnel were in a proper state of mind that made them more observant of their surroundings and indicators;
  • The initial responding units were provided with all pertinent information in a
  • timely manner relative to the incident;
  • Personnel assigned to Engine 102 possessed a comprehensive knowledge of their first-due response area;
  • A 360-degree size-up of the building accompanied by a risk – benefit analysis
  • was conducted by the company officer prior to initiating interior fire suppression operations;
  • Comprehensive standard operating guidelines specifically related to structural
  • firefighting existed within the department;
  • The communications system users (on-scene firefighters and those monitoring the incident) weren’t all vying for limited radio air time;
  • The communications equipment and accessories utilized were more appropriate for the firefighting environment;
  • Certain tactical-level decisions and actions were based on the specific conditions;
  • Personnel had initiated fundamental measures to engage in if they were to become disoriented or trapped inside a burning building; and
  • Issued personal protective equipment was utilized in the correct manner.

 

 

References

WLTW.com Previous Stories:

 

Don’t forget to LIKE Buildingsonfire on FaceBook and follow CommandSafety on Twitter

Worcester FF Brian Carroll recalls the Arlington Street Fire of December 8, 2011

No comments

Firefighter Brian Carroll reflects on the 2011 Arlington Street Fire and Cold Storage Fire of 1999.

Firefighter Brian Carroll was trapped in the basement of 49 Arlington St. after the second-floor of the three-decker collapsed underneath him and his partner on Rescue 1. He thought his close friend was OK. Firefighter Carroll lay trapped and didn’t learn until after he was freed that Firefighter Davies had died.

“What happened to my brother, the three-decker collapsed in a way no one could predict,” Robert Davies said. “Certainly I think it serves as a lesson going forward, and even if it saves one life going forward, then at least something good came out of it.”

Firefighter Davies, who was 43 when he died, has a son, Jon D. Davies Jr., in the department now as a firefighter.

  • From the Worcester Telegram & Gazette;  A cruel month for Worcester firefighters HERE
  • NIOSH REPORT Career Fire Fighter Dies and Another is Injured Following Structure Collapse at a Triple Decker Residential Fire – Massachusetts: HERE

Memorial Dedicated to Six Boston FF Killed In 1942 East Boston Luongo Fire

No comments

1942 November 15 2012

 

Memorial dedicated in East Boston (MA) honoring Six Boston firefighters who made the supreme sacrifice while battling a fire in 1942.

Bagpipes echoed through Maverick Square Thursday at the conclusion of a ceremony dedicating a memorial to six Boston firefighters who died 70 years ago.

WBZ NewsRadio 1030′s Carl Stevens reports  Download: fire-memorial-stevens-w1.mp3

2012 Memorial to the Six firefighters

Six Boston Firefighters were killed in the line of duty as a result of the collapse, all of whom were conducting operations and working on the second floor with hose lines.

Supreme Sacrifice in the Line of Duty:

  • Hoseman John F. Foley, Engine Company 3
    • 57 years of age | 30 year veteran
  • Hoseman Edward F. Macomber, Engine Company 12
    • 47 years of age | 24 year veteran
  • Hoseman Peter F. McMorrow, Engine Company 50
    • 45 years of age | 19 year veteran
  • Hoseman Francis J. Degan, Engine Company 3
    • 24 years of age | 15 month veteran
  • Ladderman Daniel E. McGuire, Ladder Company 2
    • 44 years of age | 19 year veteran
  • Hoseman Malachi F. Reddington, Engine Company 33
    • 48 years of age | 19 year veteran

      In Memoriam

 

  • CommandSafety.com Full Article, HERE 
  • CBS Boston, HERE
  • Boston Globe w Video, HERE

The 1942 Luongo’s Restaurant Fire and Collapse in East Boston; Six Boston Firefighter Line of Duty Deaths

1 comment

The 1942 Luongo’s Restaurant Fire and Collapse in East Boston; Six Boston Firefighter Line of Duty Deaths

Boston Fire Department Box 6153 Five Alarm November 15,1942

 

Boston Fire Department Box 6153 Five Alarm November 15,1942

A multiple alarm fire and collapse 70 years ago resulting in six Boston Firefighter LODDs was overshadowed by the Coconut Grove Fire which occurred 13 days later. Here’ the story and legacy.  

 The 1942 Luongo’s Restaurant Fire and Collapse in East Boston; Six Boston Firefighter Line of Duty Deaths

During the early morning hours of Sunday November 15, 1942, a still alarm followed by box alarm 6153 was received for a fire at 4-6 Henry Street located in the Old Armory Building at Maverick Square in East Boston (MA). The address was for a report of fire in the Luongo’s Restaurant. A fire broke out in the rear of Luongo’s Restaurant on the first floor at about 2:26 a.m. The Boston Fire- District #1 report stated the fire originated in the rear kitchen ceiling.

November 16, 1942 New York Times:

The following is a description of the fire from the November 16, 1942 New York Times: “The fire, starting from a fireless cooker in the cafe on the ground floor at Henry Street and Maverick Square, suddenly swept through the building.

The firemen who were killed had just entered a restaurant on the second floor with a line of hose. As the flames ate through the cross timbers the wall collapsed with a roar, burying two men on the stairs and crushing the three others manning the hose.  That part of the wall which fell outward felled about forty firemen standing on the Henry Street side of the building beside the new $20,000 ladder truck, which was buried under the wreckage. At the same, a hot air explosion blew a half dozen firemen across Henry Street.”

The Building

The Luongo’s Restaurant was housed in what was called the Armory Building a five and one half story Type III Building of ordinary construction (Brick and joist) consisting of masonry bearing walls with approximate dimensions of 35 feet width x 60 feet depth x 65 foot height. The ensuing fire would spread to the exposure building at 10 Henry Street a three story 20 ft. X 40 ft. x 40 ft type III (brick and joist) structure.

Courtesy of the Boston Public Library, Leslie Jones Collection.

 

Fire and Collapse

Upon arrival of the first alarm companies, the fire initially was commanded by Fire Captain Amsler, Ladder Co. 2. District Chief Crowley rapidly assumed command upon his arrival and directed initial fire suppression activities of the companies to interior operations and quickly ordered a second alarm at 03:04hours.

Command was subsequently transferred to Deputy Chief Louis Stickel who ordered a third alarm struck due to fire extension twenty minutes later.

Suppression, ventilation and rescue operations were conducted with the fire under control when at 04:15 hours with without warning, it was reported the 3rd, 4th and 5th floors began to collapse with the brick masonry wall on the Henry Street side collapsing outward into the street. Ladder Company 8, a new 125 ft. aerial ladder, the largest in the United States at the time was buried in the timber and brick rubble and collapse pile. It was reported that as many of 43 firefighters in the street were injured as a result of the collapse.

 

Search, Rescue and Recovery Efforts

 

The arrival of Chief of Department Samuel Pope ordered fourth and fifth alarms. This brought Engine Companies 40, 9, 5, 11, 50, 8, 32, 6, 39, 3, 33, 12, 13, 38, 21, 35, 37, 20, 16, 10, 42, 51, 19; Ladder Companies 2, 31, 21, 8 and 3.

  • First Alarm: 02:27 hrs.
  • Second Alarm: 03:05 hrs.
  • Third Alarm: 03:24 hrs.
  • Fourth Alarm: 04:20 hrs.
  • Fifth Alarm: 04:35 hrs.

With both extensive interior and exterior collapse conditions with numerous trapped and injured firefighters, rescue efforts and medical assistance was being rendered by all fire service, military, hospital and civilian resources. Local Coast Guardsman were deployed to support the massive search and rescue efforts.

 

Rescue and Recovery

Six Boston Firefighters were killed in the line of duty as a result of the collapse, all of whom were conducting operations and working on the second floor with hose lines.

Supreme Sacrifice in the Line of Duty:

  • Hoseman John F. Foley, Engine Company 3
    • 57 years of age | 30 year veteran
  • Hoseman Edward F. Macomber, Engine Company 12
    • 47 years of age | 24 year veteran
  • Hoseman Peter F. McMorrow, Engine Company 50
    • 45 years of age | 19 year veteran
  • Hoseman Francis J. Degan, Engine Company 3
    • 24 years of age | 15 month veteran
  • Ladderman Daniel E. McGuire, Ladder Company 2
    • 44 years of age | 19 year veteran
  • Hoseman Malachi F. Reddington, Engine Company 33
    • 48 years of age | 19 year veteran

 Post Requiem

The Department’s 125 foot “jinx” aerial ladder, reported to be the largest in the nation at that time, was standing beside the falling wall on Henry Street. It was buried in the wreckage. The ladder was originally purchased by the City of Somerville. They found upon delivery that it was too big for their firehouse. Boston bought it. The truck had a series of problems. (additional Story on the 1941 American La France 125′ metal aerial By William Noonan,   HERE)  Apparatus Info – See Bostonfirehistory.org HERE

Boston Ladder 8 1941 ALF 125 ft. Aerail Ladder Shop#207. Photo Courtesy BostonFireHistory.org

There was some speculation that due to the long ladder and wide bed, the large ladder might have caused the wall collapse. This theory was later ruled out. In fact, some of the firefighters who were on the ladder at the time of the collapse, credit the ladder bed with saving their lives. When the granite and debris began falling, they lay down in the bed and the rubble slid down over them to the street.

Many felt that this was the end to the ladder. But, it was repaired and returned to service in South Boston as Ladder 19. Tragedy would continue to haunt this piece of apparatus. On December 3, 1947, Ladder 19 was out of service conducting tests on its brakes when it overturned and rolled. Provisional Firefighter Joseph B. Sullivan, on the job for less than six months, was killed. The Department took the truck out of service and scrapped

Individuals Remembered

As with many of these incidents, the men involved came from different backgrounds and circumstances that put them on that second floor that fateful night.

Edward Macomber was the father of eight children and considered to be one of the best firefighters in the department according to his superior officers. He was a member of the department for 28 years, and had been injured while on duty more than seven times.

Francis Degan, at age 24 was one of the youngest members of the Boston Fire Department at the time. He had been on the job only 19 months prior to November 15th. His officers thought that the young fireman was well on his way to becoming an officer. Young Degan took great pride in being a firefighter and realized his life’s ambition when he was appointed to the department to follow in the footsteps of his father, who was attached to Ladder Company 1.

John Foley, a hoseman on Engine Company 3, had been a member of the department for more than 30 years. He was planning to retire in a short time. In a tragic case of irony , Firefighter Foley should have been on a day off at the time of the fire, but had changed his schedule in order to get some time off later.

World War 1 veteran Pete McMorrow was a bachelor member of Engine Company 50 and was loved by many of the school children of Charlestown. He had served in the Navy in the first war and was telling his closest pals that he might just be going back to serve again. At age 46, he had carried the colors of the Boston Fireman’s Post #94, American Legion, through downtown Boston. While trapped in the debris for eleven hours, McMorrow’s fellow company members crawled into the space where he lay to tell him to hang on and they’d get him out soon. Throughout the early morning and into the next day the rescue efforts continued. However, when they were finally able to get to McMorrow, it was too late.

This fire and the subsequent six firefighter line of duty deaths were overshadowed by the Cocoanut Grove Fire which occurred only 13 days later on November 28, 1942.

Memorial, Dedication, and Reception

On Thursday November 15, 2012 the East Boston Neighborhood Health Center and the Boston Fire Department will be conducting a Memorial, Dedication, and Reception in Recognition of the 70th Anniversary of the Luongo Fire at Maverick Square, East Boston.

The event is scheduled from 12:00 pm to 2:00 pm at 20 Maverick Square, Boston, MA.

 

Video: Former Boston Fire Commissioner Paul Christian shares the story of the little-known Luongo fire as well as that of the 8-alarm Thanksgiving Day Fire of 1889. November has been a tragic month in Boston’s fire history. On November 15, 1942, a fire started in the back room of the Luongo Restaurant.

Collapse Scene from Maverick Square

 

Boston Fire Department 125 ft. Aerial Ladder on Henry Street Side

  

Rescue operations on Henry Street Side

 

Present sidewalk memorial marker

 

Memorial Dedication

 

Aerial Image of current property block in East Boston (MA). Bing Maps Image

  Historical Note: Three and a half story high, with granite faced and brick exterior walls, the interior wooden joisted building at the corner of Henry Street and Maverick Square in 1942 was one of the oldest buildings in East Boston. It was typical of mid 19th century Boston commercial construction. In accounts of the fire it is frequently referred to as “Old Armory Hall”. “Armory Hall” is the name by which it was known in the early years of the 20th century. That building however never was actually an armory as such. There once was an armory in East Boston. It was located at the corner of Maverick and Bremen Streets in a wooden building that preceded the still standing brick Overseers of the Public Welfare Building. The building in which the “Luongo Fire” occurred was built sometime before 1858. It was known originally as “Ritchie Hall” likely from the name of its owner.

 

Armory Hall Building is to the left of Photo – Circa 1910

 

 

Bromley Map Image Circa 1922

Sanborn Map Image Circa 1888

Remembering Brackenridge 1991 Floor Collapse and LODD

No comments

Remembering Brackenridge, Pennsylvania December 20, 1991: Four Firefighters Killed, Trapped by Floor Collapse

Four volunteer firefighters died when they were trapped by a partial floor collapse during a structure fire in Brackenridge, Pennsylvania, on the morning of December 20, 1991. All four were members of a mutual aid truck company that had responded to the early morning incident and were assigned to prevent fire extension from the basement to the ground floor of a 2-story building.

Although they were wearing full protective clothing and using self-contained breathing apparatus, it appears that they were overwhelmed by the severe fire conditions that erupted when a section of the ground floor collapsed into the basement.

The collapse cut off their primary escape path, and the fire burned through their hose line, leaving them without protection from the flames.  

SUMMARY OF KEY ISSUES

  • Situation: Fire in enclosed room in basement. Unable to locate fire because of smoke. Smoke and heat increasing, but no visible fire.
  • Structure: Appeared to be heavy concrete construction. Actually thin concrete floors supported by unprotected steel.
  • Contents: Furniture refinishing business. Quantities of flammable finishes and solvents in basement.
  • Exits: One entrance/ exit on each level; no alternate exits.
  • Structural Collapse: Floor section collapsed between interior crew and their only exit. Fire overwhelmed crew.
  • Rescue Attempts: Valiant rescue efforts proved unsuccessful. Unsure if missing members fell into basement or were trapped on ground floor.
  • Incident Command: No formal command system or personnel accountability in place. Chief of first-due company in command of incident; Assistant Chiefs assigned to basement and ground floor.
  • Information: No pre-fire plan and no detailed knowledge of occupancy. Clues of structural danger not recognized as fire conditions increased
  • Communications: Radio system inadequate for current needs.
  • Response: Independent volunteer companies. Mutual aid requested on arrival and additional companies called in succession.
  • Weather: Extremely cold night, predawn hours. Problems with frozen hydrants.
  • Water System: Weak supply. Extensive mutual aid and long relays needed to protect exposures.

The analysis of this incident provides several valuable lessons for the fire service. Unfortunately these are all revisited lessons, not new discoveries. These firefighters died in the line of duty, while conducting operations that appeared to be routine, and were unaware of the situation that was developing below them. They died in spite of the fact that they were experienced, they were operating with a standard approach to operational safety, and they were the object of repeated rescue attempts by highly capable comrades.

There are several factors that could have provided warning or changed the outcome of this situation. Like most accidents, this situation was the result of a number of problems that came together under the worst possible circumstances. Firefighting obviously involves inherent dangers that must be accepted by its practitioners. The important messages for the fire service are to identify risk factors in advance of an incident and to develop mechanisms to react appropriately when critical situations present themselves.

This situation bears distinct similarities to other incidents that have claimed the lives of several firefighters in the past. The lessons that must be derived from this incident are not a condemnation of the actions or judgment of anyone who was involved in the situation; they simply identify information that can help to prevent this type of accident from occurring in the future.

  • USFA Report; HERE
  • NFPA Summary; HERE
  • NFPA Report Order; HERE 
  • Issues related to recent trends in floor collapse incidents, HERE

FDNY: Building Collapse Claims Life Of 1 Of 5 Workers Rescued

No comments

Robert Mecea/Associated Press

 
 A five-story building under construction suddenly came down on Monday afternoon in Brooklyn, New York. Three workers became trapped under the rubble after the top two floors fell onto the third, sending it all crashing to the ground, officials said. Published reports indicate that the likelihood of  the weight of the concrete caused the 3rd floor to collapse onto the 2nd floor, resulting in a catastrophic and sequential progressive floor collapse.
 
FDNY companies searched through the pile of concrete, pulling five workers out. Investigators said concrete being poured between the metal pillars buckled the building.
 
The building, at 2929 Brighton Fifth Street, near Neptune Avenue (Brooklyn) fell just before 2:30 p.m. A concrete worker on the site stated according to reports that the collapse happened immediately after concrete from his truck was pumped up onto the second and third floors of the building.
 
Four workers were in the building at the time of the collapse, and one was in front of the building. The one in front refused medical attention.  Firefighters said the framework of the building had been erected, but not much else. Removing the men from the rubble was a delicate and difficult process because of the risk of further collapse. Even after the men were removed, a large piece of corrugated metal hung in front of the building.
 
 

FDNY Twitter Feed

 Additional Links

 

Remembrance: FDNY and Buffalo(NY) Double LODD from Floor Collapse

1 comment

 

Dangers of Floor Collapse

Take the time to revisit two Firefighter LODD incidents that both occurred in the month of August in 2006 and 2009 respectively. Excerpts from the NIOSH Reports have been included that are part of the NIOSH FIRE FIGHTER FATALITY INVESTIGATION AND PREVENTION PROGRAM (HERE).

Both of these incidents involved a double firefighter line-of-duty death (LODD) and resulted from a floor collapse during the conduct of operations within the fire involved structures. There are numerous lessons learned and recommendations that can be considered and applied in organizations and agencies across the country, both large and small; career or volunteer.

These incidents bring to light the occupancy risks present in some of our most common of building occupancies, and continue to provide the basis for operational considerations and management based upon occupancy risk versus occupancy type. There are numerous operational considerations when addressing fires located in basement or underdeck areas and the subsequent management of those incidents based upon known or assumed building characteristics, occupancy risk and profile, inherent or presumed building stability and potential for structural compromise and the operational risk from isolated or catastrophic of collapse.

  • Buffalo (NY) Fire Department: August 24, 2009
  • FDNY: August 27, 2006

Some Other Links related to Floor Collapses and Reference Links for Operational Insights and Operating Experience (OE)

Here are some Safety Considerations related to Residential Occupancies (non-inclusive) for Operations at Basement Fires that will support fireground operational safety:

  • Conduct a thorough fire size-up and communicate the findings to all personnel on-scene before entering the building.
  • Conduct an assessment of the Building Profile ( building construction type, structural assembly systems and features and age) and assesss fire behavior and intensity levels.
  • Ensure an adequte Risk Assessement is conducted and that Risk versus Gain is determined
  • Maintain situational awareness throughout the tactical deployment of crews within the interior of the structure
  • Conduct a 360 degree perimeter assesement when feasible to determine access and egress points, fire location and travel and other mission critical operational perameters.
  • Incident commanders and company officers should be trained and experienced in structure fire size up to avoid putting fire fighters at unneeded risk of working above fire-damaged floors.
  • Do not enter a structure, room, or area when fire is suspected to be directly beneath the floor or area where fire fighters would be operating, or if the location of the fire is unknown.
  • Never assume structural safety of any floor (regardless of the construction) having a significant fire under it.
  • Conduct pre-incident planning inspections during the construction phase to identify the type of floor construction.
  • If pre-planning is not conducted, assume residential construction and small commercial buildings built since the early 1990s may contain engineered wood I-joists.
  • Report construction deficiencies noted during preplanning to local building code officials. For example, engineered wood floor joists should only be modified per manufacturer specifications—usually limited to cutting to length and removing pre–cut knockouts for utility access. Report damaged or cut chords or webs to building officials.
  • Develop, enforce, and follow standard operating procedures (SOPs) on how to size up and combat fires safely in buildings of all construction types. Rapid intervention teams (RIT) should include a portable ladder with their RIT equipment when deployed at basement fires.
  • Ensure Time Compression is considered: Ensure Command has the ability to monitor progress or elapsed incident time and adjusts strategic and tactical plans accordingly and in a time effective manner. 
  • Provide training on identifying signs of weakened floor systems (soft or spongy feel, heat transmitted through floor, downward bowing, etc.).
  • Make fire fighters aware that all floor types can fail with little or no warning.
  • Use a thermal imaging camera to help locate fires burning below or within floor systems, but recognize that the camera cannot be relied upon to assess the strength or safety of the floor. (Refer to the recent UL Test Data and Operational Safety Considerations ”Structural Stability of Engineered Lumber in Fire Conditions” available at http://www.uluniversity.us/ )
  • Fire fighters should be trained on the use of thermal imaging cameras, including limitations and difficulties in detecting fire burning below floor systems. (See reference to UL above)
  • Immediately evacuate and, if possible, use alternate exit routes when floor systems directly beneath the floor where fire fighters would be operating are weakened by fire.
  • Use defensive overhaul procedures after fire extinguishment in structures containing fire-damaged floor systems of all types.
  • Consider becoming active in the building code process and influence requirements for fire resistance of floor and ceiling systems to further fire fighter safety and health.
  • Ensure RIT personnel area staged and have complete a site assessment of the building and occupany upon thier arrival and set-up
  • Ensure that a rapid intervention team (RIT) is on the scene as part of the first alarm and in position to provide immediate assistance prior to crews entering a hazardous environment
  • 

REMEMBRANCE  

Buffalo (NY) Fire Deparment- August 24, 2009  1815 Genesee Street, Buffalo, NY 

Career Lieutenant Dies Following Floor Collapse into Basement Fire and a Career Fire Fighter Dies Attempting to Rescue the Career Lieutenant – New York (REPORT HERE)

The Structure, (pre-fire conditions)

SUMMARY

On August 24, 2009, a 45-year-old male career lieutenant (Victim #1) died following a partial floor collapse into a basement fire, and a 34-year-old male career fire fighter (Victim #2) was fatally injured while attempting to rescue Victim #1. The career fire department was dispatched for “an alarm of fire” with reported civilian(s) entrapment. Arriving units discovered a heavily secured mixed commercial/residential structure with smoke showing. Following failed initial attempts to locate an entry to the basement, crews located a door on Side 2 that provided access down a flight of stairs to a basement entry door. Repeated attempts were made to force open this basement door in order to search for trapped civilians, but crews had difficulty gaining access through this door because it was made of steel and locked and dead-bolted on both sides. Other crews on scene performed primary searches of the 1st and 2nd floors with no civilians found.

Approximately 30 minutes into the basement fire, command ordered all interior crews to exit the structure to regroup because crews were still unable to gain access into the basement from Side 2. Additional manpower was sent with special tools to assist in breaching the basement door on Side 2. Victim #1 and two fire fighters from his crew entered into the structure from Side 1 to verify all fire fighters had exited a 1st floor deli. Victim #1, following a hoseline into the structure, was well ahead of the other two fire fighters when the 1st floor partially collapsed beneath him. Victim #1 fell with the floor into the basement, exposing him to the basement fire. The other two fire fighters immediately exited the deli after fire conditions quickly changed and shelving and displays fell on them; they were unaware of what had just occurred. Victim #1 made several Mayday calls from within the structure and activated his PASS device. Confusion erupted exteriorly on scene when trying to verify who was calling the Mayday, their exact location, and how they got into the basement. The incident commander was aware that he had crews attempting to gain access into the basement from Side 2 but was unaware that there had been a floor collapse within the deli section of the structure.

Simultaneously, Victim #2, a member of the fire fighter assistance and search team (FAST), was standing by outside Victim #1’s point of entry when the Mayday calls came out. It is believed that Victim #2 knew where Victim #1 was since he had gone in the structure with him earlier in the incident. Victim #2 grabbed a tool, went on air, and rushed into the structure. The FAST and additional personnel on scene concentrated on Side 2 initially while other fire fighters followed an unmanned hoseline into the deli. Crews within the deli quickly discovered a floor collapse and reported hearing a PASS device alarming. Victim #1 was immediately identified as missing during the first accountability check, but Victim #2 was not accounted for as missing until the third accountability check, more than 50 minutes after Victim #1’s Mayday. After the fire was controlled, both victims were discovered side-by-side in the basement where the 1st floor had partially collapsed. They were found without their facepieces on and with SCBA bottles empty. Victim #1’s PASS device was still alarming. They were pronounced dead on scene. Four fire fighters and one lieutenant suffered minor injuries during the incident. No civilians were discovered within the structure.

F2009-23 Aug 24, 2009 Career lieutenant dies following floor collapse into basement fire and a career fire fighter dies attempting to rescue the career lieutenant – New York PDF Adobe PDF file

Key contributing factors identified in this investigation include working above an uncontrolled, free-burning basement fire; interior condition reports not communicated to command; inadequate risk-versus-gain assessments; and, crew integrity not maintained.

NIOSH has concluded that, to minimize the risk of similar occurrences, fire departments should:

  • Ensure that all personnel are aware of the dangers of working above a fire, especially a basement fire, and develop, implement, and enforce a standard operating procedure (SOP) that addresses strategies and tactics for this type of fire.
  • Ensure that the incident commander (IC) receives interior status reports and performs/continues evaluating risk-versus-gain.
  • Ensure that crew integrity is maintained at all times on the fireground.
  • Ensure that the incident commander (IC) receives accurate personnel accountability reports (PAR) so that he can account for all personnel operating at an incident.
  • Ensure that a separate incident safety officer, independent from the incident commander, is appointed at each structure fire.
  • Ensure that fire fighters use their self-contained breathing apparatus (SCBA) and are trained in SCBA emergency procedures.

Additionally, manufacturers, equipment designers, and researchers should:

  • Conduct research into refining existing and developing new technologies to track the movement of fire fighters inside structures.
  • Continue to develop and refine durable, easy-to-use radio systems to enhance verbal and radio communication in conjunction with properly worn self-contained breathing apparatus (SCBA)

    Fire and Rescue Operations

     

Front of structure
Incident scene.
(Photo courtesy of fire department. From NIOSH REPORT)

 

RECOMMENDATIONS

Recommendation #1: Fire departments should ensure that all personnel are aware of the dangers of working above a fire, especially a basement fire, and develop, implement, and enforce a standard operating procedure (SOP) that addresses strategies and tactics for this type of fire.

Discussion: Basement fires can be taxing and test a fire fighter’s knowledge and skill on how to combat it safely and effectively. Fire burning underneath floors can significantly degrade the floor system with little indication to fire fighters working above.1 They need to be aware of rapid heat buildup, little or no ventilation, limited accessibility, and whether it is a storage place for unknown hazards (e.g., combustibles, hazardous materials, and flammable liquids). Also of concern for fire departments is how to determine how long a fire has gone undetected. Fire fighters should be aware of what is stored on the floor directly above a basement fire, what the finished floor is comprised of (e.g., terrazzo, plywood, tongue-and-groove, tile, etc.), and what the floor structural members are comprised of (e.g., engineered wood floor joists, concrete, or steel). Structural support members may be directly exposed to fire, causing them to weaken and increase the likelihood of an above-floor collapse. Interior crew(s) intending to operate on the floor above a basement fire should limit their operating time, especially if ventilation, suppression, and accessibility are not progressing. The floor’s structural members will continue to weaken as fire and heat intensify. Specifying an exact length of time for how long suppression crew(s) should operate above a basement fire is questionable, and the IC should make that determination by performing a hazard analysis/risk assessment. The fire department did not have an SOP specifically addressing strategies and tactics when combating basement fires. SOPs should be developed to address structural fire fighting operations specific to basement fires, because these types of fires present a complex set of circumstances and following established SOPs will minimize the risk of serious injury to fire fighters.

During this incident, fire fighters were unable to access the basement, unable to ventilate the basement fire, and unaware of the fire load found within the basement. Initially, the department did not cut a hole in the 1st floor apartment or deli and use their Bresnan distributor, in fear of injuring reported trapped civilians. Note: The Bresnan distributor is a type of cellar nozzle used to suppress fire through steam conversion. The use of a cellar nozzle, like a Bresnan distributor, during the initial stages of the basement fire may have assisted in containing the fire and/or allowing better operating conditions for fire fighters to access the basement.2 Attempts were made to flow water on the 1st floor where fire had vented through, but this effort was not successful. Fire fighters should also recognize that fire venting through a floor is a late indication of a weakened floor system.

Recommendation #2: Fire departments should ensure that the incident commander (IC) receives interior status reports and performs/continues evaluating risk-versus-gain.

Discussion: Among the most important duties of the first officer on the scene is conducting an initial size-up of the incident. A proper size-up begins from the moment the alarm is received, and it continues until the fire is under control. The size-up should also include assessments of risk-versus-gain during incident operations, especially after primary searches have been conducted.2-7 The size-up should include an evaluation of factors such as the fire size and location, length of time the fire has been burning, conditions on arrival, occupancy, fuel load and presence of combustible or hazardous materials, exposures, time of day, and weather conditions. Information on the structure itself should include size, construction type, age, condition (e.g., evidence of deterioration, weathering), evidence of renovations, lightweight construction, loads on roof and walls (e.g., air conditioning units, ventilation ductwork, utility entrances), and available preplan information are all key information that can affect whether an offensive or defensive strategy is employed. The incident commander should be willing to change his strategy and plan based on continued size-ups and risk assessments until the fire is brought under control. Conducting accurate size-ups and receiving interior/exterior status updates is critical to the safety of fire fighters on the incident, rescue/recovery efforts, and overall control of the incident. “The decision to commit interior firefighting personnel should be made on a case-by-case basis with proper risk-benefit decisions being made by the incident commander. The commitment of firefighters’ lives for saving property and an unknown or marginal risk of civilian life must be balanced appropriately.” 8 The fireground is very dynamic, and conditions can either improve or deteriorate based on fire suppression activities, and available resources, and most importantly assessments/size-ups of the incident are necessary to detect a change on the fireground.

During this incident, the fire department was attempting to gain access to reported trapped civilian(s) in a basement. The command post was established at the front of the structure providing views of Side 1 and Side 2. The basement contained heavy smoke and fire and was inaccessible from exterior and interior access doors. The initial IC and the IC who assumed command performed initial size-ups and received radio updates on fire and smoke conditions from personnel working on the incident, but not all interior findings were reported. Crews working in the 1st floor apartment encountered fire venting through the floor on Side 4 as early as 9 minutes after the first apparatus arrived on scene. Ten minutes later, Victim #1 was flowing water on fire that had vented in the corner of Side 3 and Side 4 of the deli. This was the same general area where crews within the 1st floor were working. The only thing separating the apartment and deli was a wall of floor coolers. The basement fire burned uncontrolled for more than 30 minutes while fire fighters continued attempts to gain access to the basement. Incident updates on the radio included transmissions such as “untenable” and “time to get out,” prior to the 1st floor partial collapse. The IC also mistook “water on the fire” as fire fighters actually attacking the basement fire from Side 2. This provided the IC with a false sense of progress on combating the basement fire. Also, during this incident, the IC was at times monitoring multiple radio channels and some additional transmissions may not have been received. Radio transmissions are very important for the IC to hear, acknowledge, and prioritize so that the IC can maintain situational awareness, and accurately and effectively manage and direct fireground operations. A chief’s aid or incident command technician assigned to the IC may have assisted the IC in monitoring the fireground channels and distinguishing key radio traffic and updates. It is reasonable to believe that, as time progressed and basement fire conditions continued to be uncontrolled, that the chances of survival diminished for any potentially trapped civilians exposed to the heat or products of combustion found within the smoke. According to fire investigators with the fire department, only the bodies of Victim #1 and Victim #2 were found within the structure.

Recommendation #3: Fire departments should ensure that crew integrity is maintained at all times on the fireground.

Discussion: Fire fighters should always work and remain in teams whenever they are operating in a hazardous environment.2 Team integrity depends on team members knowing who is on their team and who is the team leader; staying within visual contact at all times (if visibility is low, teams must stay within touch or voice distance of each other); communicating needs and observations to the team leader; and rotating together for team rehab, team staging, and watching out for each other (e.g., practicing a strong buddy system). Following these basic rules helps prevent serious injury or even death by providing personnel with the added safety net of fellow team members. Teams that enter a hazardous environment together should leave together to ensure that team continuity is maintained. 3

During this incident, raw video captured the FAST working on Side 1 of the structure (same side that Victim #1 had entered) during Victim #1’s “Mayday.” At the same time, Victim #2, assigned to the FAST, was seen pointing at Side 1, donning his SCBA, and entering the structure as other fire fighters were exiting from Side 1. The FAST was activated and ordered to Side 2 where it was believed the “Mayday” transmission came from. Victim #2 went missing following the “Mayday” and his whereabouts were unknown until the recovery of Victim #1. Also, Victim #1 entered the deli not realizing that two of his team members from R1 were not following behind. Not verifying your crew is with you and/or working alone increases the risk to individuals and possibly to others during search and rescue efforts. During interviews, the fire department commented on an increase in “freelancing” following the Mayday.

floor collapse from inside the building
Photo 6. Interior view of deli following partial floor
collapse and recovery operations.
(Photo courtesy of police photographer. From NIOSH REPORT)
basement storage basement storage
Photo 7 . Views of materials stored within basement.
(Photos courtesy of police photographer. From NIOSH REPORT)

 

Recommendation #4: Fire departments should ensure that the incident commander (IC) receives accurate personnel accountability reports (PAR) so that he can account for all personnel operating at an incident.

Discussion: An important aspect of an accountability system is the personnel accountability report (PAR). A PAR is an organized on-scene roll call in which each supervisor reports the status of his crew when requested by the IC or emergency dispatcher.2 The use of an accountability system is recommended by NFPA 1500 Standard on Fire Department Occupational Safety and Health Program9 and NFPA 1561 Standard on Emergency Services Incident Management System.10 A functional personnel accountability system requires the following:

  • development of a departmental SOP
  • training all personnel
  • strict enforcement during emergency incidents

As the incident escalates, additional staffing and resources may be needed, adding to the burden of tracking personnel. An incident command board should be established at this point with an assigned accountability officer or aide. As a fire escalates and additional fire companies respond, a chief’s aide or accountability officer assists the incident commander with accounting for all fire fighting companies at the fire, at the staging area, and at the rehabilitation area. With an accountability system in place, the incident commander may readily identify the location and time of all fire fighters on the fireground. A properly initiated and enforced accountability system that is consistently integrated into fireground command and control enhances fire fighter safety and survival by helping to ensure a more timely and successful identification and rescue of a disoriented or downed fire fighter. This department has developed and implemented SOPs governing accountability and even assigns an accountability officer to the IC to assist with radio transmissions and PARs.

An accountability officer was assigned to assist the IC during the incident. A PAR was immediately obtained following the rescue attempts for Victim #1. Victim #1 was identified as “missing,” but Victim #2 was incorrectly identified as “accounted for.” Victim #2 was incorrectly “accounted for” during a second separate PAR. Prior to a third PAR, 50 minutes following the floor collapse, Victim #2 could not be visibly accounted for on the fireground and his whereabouts were unknown. Officers need to visually account for their members prior to providing an “all accounted for” to the IC or accountability officer. Quickly being able to account for all personnel at an incident is paramount and can determine how an IC orders search and rescue efforts or other suppression activities.

Recommendation #5: Fire departments should ensure that a separate incident safety officer, independent from the incident commander, is appointed at each structure fire.

Discussion: According to NFPA 1561 Standard on Emergency Services Incident Management System, 11 “The incident commander shall have overall authority for management of the incident and the incident commander shall ensure that adequate safety measures are in place.” This shall include overall responsibility for the safety and health of all personnel and for other persons operating within the incident management system. While the incident commander is in overall command at the scene, certain functions must be delegated to ensure adequate scene management is accomplished. 10 According to NFPA 1500 Standard on Fire Department Occupational Safety and Health Program, 9 “as incidents escalate in size and complexity, the incident commander shall divide the incident into tactical-level management units and assign an incident safety officer (ISO) to assess the incident scene for hazards or potential hazards.” These standards indicate that the incident commander is in overall command at the scene but acknowledge that oversight of all operations is difficult. On-scene fire fighter health and safety is best preserved by delegating the function of safety and health oversight to the ISO. Additionally, the incident commander relies upon fire fighters and the ISO to relay feedback on fireground conditions in order to make timely, informed decisions regarding risk versus gain and offensive-versus-defensive operations. The safety of all personnel on the fireground is directly impacted by clear, concise, and timely communications among mutual aid fire departments, sector command, the ISO, and the incident commander. NFPA 1521 Standard for Fire Department Safety Officer defines the role of the ISO at an incident scene and identifies duties such as recon of the fireground and reporting pertinent information back to the incident commander; ensuring the department’s accountability system is in place and operational; monitoring radio transmissions and identifying barriers to effective communications; and ensuring established safety zones, collapse zones, hot zones, and other designated hazard areas are communicated to all members on scene.11 Larger fire departments may assign one or more full-time staff officers as safety officers who respond to working fires. In smaller departments, every officer should be prepared to function as the ISO when assigned by the incident commander. The presence of a safety officer does not diminish the responsibility of individual fire fighters and fire officers for their own safety and the safety of others. The ISO adds a higher level of attention and expertise to help the fire fighters and fire officers. The ISO must have particular expertise in analyzing safety hazards and must know the particular uses and limitations of protective equipment. 4

During this incident, the designated department ISO was not dispatched until the incident was upgraded to a 2nd alarm because it occurred after the normal duty shift of the ISO. The ISO did not arrive until rescue/recovery operations had begun on breaching the Side 4 wall. The presence of an ISO throughout this incident would have allowed the IC to focus on supervising the incident while the ISO directed safety operations.

Recommendation #6: Fire departments should ensure that fire fighters use their self-contained breathing apparatus (SCBA) and are trained in SCBA emergency procedures.

Discussion: Fire fighters are tasked at times to operate within environments which pose inhalation hazards (e.g., toxic smoke and oxygen deficiency12), defined by OSHA as immediately dangerous to life and health (IDLH). Proper training along with an implemented and enforced policy or procedure will assist fire fighters with proper maintenance, use, and removal of a SCBA. OSHA 29 CFR 1910.134 (g)(4)(iii) states, “all employees engaged in interior structural firefighting use SCBAs.”13 During this incident, the medical examiner stated both victims died from inhalation of products of combustion. The medical examiner also indicated that the victims’ COHb levels (a measure of carbon monoxide in the bloodstream) were over 50%. Even if nothing but carbon dioxide, water vapor, and nitrogen were present in the fire products and these were to mix with the air being breathed by a fire fighter, then the oxygen percentage would be reduced below the normal 21%. At 15% oxygen, fire fighters can experience lethargy, poor coordination, and confused thinking. The two principal toxins in smoke—carbon monoxide and hydrogen cyanide—act to deprive the brain of oxygen, and their effects would be enhanced due to the lower levels of oxygen in the air.14 Both victims were discovered without their facepieces on.

Due to the smoke conditions, both victims would have had to have been on air when entering the structure. It has not been determined why both victims were found without their facepieces on, but NIOSH investigators have theorized the following possibilities:

  • Victim #1 removed his facepiece to transmit his “Mayday.”
  • Both victims’ facepieces were unintentionally knocked off when falling into the basement.
  • The facepieces were removed because they ran out-of-air or other emergency situation.

Emergencies created by, or associated with, SCBAs can be overcome in several ways. Fire departments can develop and implement a comprehensive respiratory protection program15 that includes fire fighter fitness, training, competency, and skill in SCBA and emergency procedures. Firefighters should remember the first rule in any emergency situation, and that is not to panic. Panic causes increased breathing air consumption and inability to focus on emergency procedures. If fire fighters become lost, trapped, or disoriented they need to focus on managing remaining air in their SCBA cylinder until other fire fighters can make a rescue attempt. Removing one’s facepiece in an IDLH atmosphere can immediately expose the respiratory system to a potentially fatal environment, thus incapacitating an individual. Choosing to leave one’s SCBA facepiece on may be the best chance in providing additional time for a fire fighter to be rescued. Fire fighters should follow their department’s SOPs regarding emergency SCBA procedures and emergency communications.

Recommendation #7: Manufacturers, equipment designers, and researchers should conduct research into refining existing and developing new technologies to track the movement of fire fighters inside structures.

Discussion: Fire fighter fatalities often are the result of fire fighters becoming lost or disoriented on the fireground. The use of systems for locating lost or disoriented fire fighters could be instrumental in reducing the number of fire fighter deaths on the fireground. The National Institute of Standards and Technology (NIST) has been evaluating the feasibility of real-time fire fighter tracking and locator systems for some time.16, 17 Another group researching advanced fire fighter locator and tracking systems is the Maryland Fire Rescue Institute, located at the University of Maryland – College Park.18 Research into refining existing systems and developing new technologies for tracking the movement of fire fighters on the fireground should continue. While it is not clear that the use of this technology in this incident would have prevented the fatalities, such technology could potentially have reduced the search time by aiding rescue teams in pin-pointing the location of the missing fire fighters. This new technology must function properly in the severe fire conditions often encountered during rescue operations.

During the initial stages of the incident, it was not known who was transmitting the Mayday, where exactly they were in the basement, or how they got into the basement. Victim #2 went accounted for approximately 50 minutes before a determination was made that Victim #2 was also missing. It was not until rescue/recovery crews visually located the victims that they accounted for the location of Victim #2. This technology may have assisted the fire department during this incident in more quickly locating Victim #1 and Victim #2.

Of importance, Victim #1’s PASS device was alarming during the Mayday and when he was discovered, but it was reported to NIOSH investigators that Victim #2’s PASS device was never heard. Victim #2’s PASS device was evaluated as part of NIOSH’S NPPTL SCBA inspection. Victim #2’s PASS device failed to function when tested, but after the batteries were replaced within the PASS device, it alarmed appropriately. It has not been determined if the battery life was exhausted prior to Victim #2 going into the structure. It is important to note that the 2007 revision to NFPA 1982 Standard on Personal Alert Safety Systems (PASS) includes new heat and flame resistance requirements resulting from documented reports where PASS devices were not heard during fatal fireground incidents. 19 Laboratory testing conducted by NIST determined that exposure to high temperature environments caused the loudness of the tested PASS alarm signal to be reduced. This reduction in loudness can cause the alarm signal to become indistinguishable from background noise at an emergency scene. Initial laboratory testing by NIST highlighted that this sound reduction may begin to occur at temperatures as low as 300°F. Thus the use of PASS devices meeting NFPA 1982, 2007 Edition requirements is highly recommended.

Recommendation #8: Manufacturers, equipment designers, and researchers should continue to develop and refine durable, easy-to-use radio systems to enhance verbal and radio communication in conjunction with properly worn self-contained breathing apparatus (SCBA).

Discussion: The use of Personal Protective Equipment (PPE) and an SCBA make it difficult to communicate, with or without a radio.20-22 Faced with the difficult task of communicating while wearing a SCBA, fire fighters sometimes momentarily remove their facepieces to transmit a message directly or over a portable radio. Considering the toxic and oxygen-deficient hazards posed by a fire and the resulting products of combustion, removing the SCBA facepiece, even briefly, is a dangerous practice that should be prohibited. Even small exposures to carbon monoxide and other toxic agents present during a fire can affect judgment and decision-making abilities. To facilitate communication, equipment manufacturers have designed facepiece-integrated microphones, intercom systems, throat mikes, and bone conduction mikes worn in the ear or on the forehead.20-22

During this incident, interviewed fire fighters complained of radio transmissions being unintelligible at times or not heard at all. Although NIOSH investigators are not certain why Victim #1 and Victim #2 were found without their facepieces on, one theory is that Victim #1 may have momentarily removed his facepiece to better transmit his Mayday. Fire fighters recall hearing his transmissions as they came across the radio and also emanating clearly from the structure.

Recent testing by the National Institute for Standards and Technology (NIST) of portable radios in simulated fire fighting environments has identified that radios are vulnerable to exposures to elevated temperatures. Some degradation of radio performance was measured at elevated temperatures ranging from 100°C to 260°C, with the radios returning to normal function after cooling down. Additional research is needed in this area.16, 20 Fire service radios also need to be waterproof as normal fireground conditions dictate that radios are frequently exposed to excessive amounts of water during routine use through exposure to hose streams, overspray, water dripping from overhead, etc.

Other Links;

 

FDNY- August 27, 2006 Walton and East Mount Eden Avenues, Bronx, NY

Floor Collapse at Commercial Structure Fire Claims the Lives of One Career Lieutenant and One Career Fire Fighter – New York (REPORT HERE)

SUMMARY
On August 27, 2006, a 43-year-old male career Lieutenant (victim #1) and a 25-year-old male fire fighter (victim #2) died after the floor they were operating on collapsed at a commercial structure fire. At approximately 1230 hours, crews were dispatched to a fire. The victims’ engine was dispatched at 1236 hours as an additional unit alarm and arrived on the scene at approximately 1240 hours. At approximately 1251 hours, victim #1, victim #2 and fire fighter #1 advanced a 2 ½-inch hand line through the front of the structure and down an aisle toward the rear of the store. The fire was located in the rear interior of the structure (discount store) that sold a variety of numerous small household commodity items. Approximately three minutes later, the structural members supporting the floor directly below the victims failed. The V-shaped collapse of the floor caused victim #1 and victim #2 to fall into the basement and shelving stocked with merchandise to fall in on top of them. Multiple MAYDAYs were transmitted and the fire fighter assist and search team (FAST) was deployed to the front of the structure where they assisted in the rescue of numerous members who had been operating in the interior of the structure at the time of the collapse. Battalion Chief #1, Lieutenant #1 and fire fighter #1 were freed from the debris. At approximately 1415 hours, victim #1 was removed from the debris in the basement and transported to the hospital. He died the next day as a result of his injuries. At approximately 1435 hours, victim #2 was removed from the basement and transported to the hospital where he was pronounced deceased as a result of his injuries.

F2006-27 Aug 27, 2006 Floor collapse at commercial structure fire claims the lives of one career lieutenant and one career fire fighter – New York PDF Adobe PDF file

NIOSH investigators concluded that, to minimize the risk of similar occurrences, fire departments should:

  • consider the possibility of a substandard structure when building information is not available from pre-incident plans
  • consider the live load of water on the structure and go defensive when water load potentially compromises the structural integrity

Additionally, municipalities should:

  • explore means of coordinating information sharing between building and fire departments to increase safety for fire fighters and civilians
  • consider conducting inspections on all commercial structures where a change of occupancy has occurred or renovations are known or suspected, giving special attention to non-sprinklered commercial retail structures

RECOMMENDATIONS/DISCUSSIONS

Recommendation #1: Fire departments should consider the possibility of a substandard structure when building information is not available from pre-incident plans, and implement a defensive strategy when no occupants are at risk.

Discussion: The threat of a collapse of some type (i.e. roof, ceiling, floor or wall) is a possibility in any structural fire due to the effects of fire, water application, age, insects, and alterations. It is a high probability that a fire department is unaware of structural defects caused by age, insects and alterations. To minimize the risk of injury or death to fire fighters during structural operations, the size-up and risk assessment includes many factors, which include: age of the building (deterioration of structural members, evidence of weathering, use of lightweight materials in new construction), occupancy, and renovations or modifications to the building.3,4,5

Pre-incident plans are an effective tool in preventing injuries and deaths of fire fighters due to structural collapse.  They allow fire departments to determine factors, such as, age of the structure, structural integrity, type of materials used in the structure, and amount of load on the roof that could weaken the supports, etc.  However, in numerous cities and towns where buildings number in the hundreds of thousands, fire departments lack the manpower to pre-plan all buildings under their protection. Often fire departments are limited to targeting buildings that have a unique construction or pose a known hazard.

In floor collapses that have occurred, such as those at a New York City drug store (October 17, 1966) and at a Boston hotel (June 17, 1972), there were no warning signs, and no time to act and withdraw fire fighters to safety. At both of these floor collapses, unauthorized alterations on the structure contributed to the structural failure.5

“The potential for structural collapse is one of the most difficult factors to predict during initial size-up and ongoing fire fighting. Structural collapse usually occurs without warning.” 3 When pre-incident plan information on the fire structure is not available, occupants have been evacuated, and evidence of structural deterioration and/or modification cannot be determined, a defensive strategy should be implemented. A defensive strategy would help ensure fire fighter safety and is warranted in structures that lack pre-incident plans, no occupants are at risk, and where the potential for numerous unrecognized hazards exists, such as substandard construction and building deterioration.

Fire departments operating in older businesses and homes should be suspicious of potential alterations and renovations which could result in unsupported loads and unusual voids. These alterations may be hidden by sheetrock (drywall) or flooring and built up flooring which is difficult to detect during inspections and virtually impossible to detect during firefighting operations. The older the structure, the greater the possibility of renovation or remodel.

In this case, there were no current pre-incident plans for the structure; the occupants had evacuated upon the fire department’s arrival, and compromised structural integrity was not immediately evident. Structural alterations had been made to the girders, columns, and floor in order to presumably level and support the floor. A post incident inspection showed 2 x 4 boards being used inappropriately (in orientation and stability) as a floor joist. A cluster of nails were used in lieu of bolts to attach gusset plates to the columns and girders. Sheets of plywood were added to the floor with no structural support around the sheet’s edges nor at 12”, 16” or even 24” intervals in accordance with standard building codes. Subflooring (i.e., plywood, wafer board, etc.) needs to be fastened around the sheet’s edges and at interval spacing (generally every 16 inches, but spacing may vary according to load requirements) to support floor joists. The interior support members of the structure suffered from severe rot at the base of the timber columns.

Recommendation #2 : Fire departments should consider the live load of water on the structure and go defensive when water load potentially compromises the structural integrity.

Discussion: A forensic engineering analysis of the fire building demonstrated that the weight of water added to the building from the fire fighting operations was approximately 50% of the rated structural capacity of the floor.2 As noted previously, however, timbers that supported the ground floor had rotted. Thus, the actual structural capacity of the floor was less than rated. Although the ultimate cause of the collapse was the rotted timbers, the weight of the water applied during the fire fighting operations, in addition to the weight of fire fighters, store merchandise, etc., likely contributed to the collapse. Given the many unknowns during fire fighting operations, including in most incidents the rated capacity of floors, incident commanders need to continuously consider the impact of water weight on structural integrity, and shift to defensive strategies when structural integrity is potentially compromised.

Firefighting operations can drastically increase the live load on the fire building. This can be due to the weight of:

  1. the firefighters with their protective equipment and tools,
  2. the hose-line brought into the fire building, and
  3. the water used to attack the fire6.

A 2 ½ -inch hose-line can deliver approximately 250 gallons of water per minute. 5 This adds about 2,082 pounds per minute into the fire building. If multiple hose-lines are operating, the weight of the water can be tremendous.

When operating in an offensive mode, a buildup of water within a building requires that immediate action be taken to alleviate these conditions. 6 The remedy may be as simple as controlling the excess flow from the hose-line or moving fire debris that is restricting runoff. When using large amounts of water, it is always advisable to provide for drainage when necessary. This can be accomplished any number of ways from chutes with traps to actual holes drilled to provide relief. 6

It must be recognized that at the same time that this additional weight is being introduced into the fire building, the fire and water are weakening the structure. Under these conditions, a defensive strategy is best when no civilians are in the structure. 5

In this case, civilians had evacuated the fire building upon the fire department’s arrival. The structures’ configuration only enabled an initial attack through the front of the structure and down narrow aisle ways to the rear of the structure where the origin of the fire was located. Prior to the collapse, three 2 ½-inch hose-lines (operating 17 minutes, 8 minutes, and 2 minutes, respectively) were flowing water through and into the rear of the structure. The added weight and flow of the water could have contributed to the floor collapse because of the rotted support columns decreasing the timber frame system’s ability to equalize the water load across the floor.

location of victims
Diagram 2. Shows location of victims on the structure’s floor above the girder that failed. From the NIOSH REPORT

 

Additionally,

Recommendation #3 : Municipalities should explore means of coordinating information sharing between building and fire departments to increase safety for fire fighters and civilians

Discussion: Information on building construction, renovations, and alterations can help Incident Commanders develop strategies and tactics that effectively fight fires while attending to fire fighter safety. Pre-incident plans are a useful tool for ensuring that fire departments and Incident Commanders have information on building construction and contents to guide decision-making on the fireground. In urban areas with large numbers of existing structures, it may not be feasible to develop pre-incident plans for all or most structures, and for fire departments to regularly revisit structures to update pre-incident plans. Municipal building departments that issue building permits and conduct code inspections may collect, or be in position to collect, information that may be useful to fire departments. Municipalities should consider exploring mechanisms by which building information relevant to fire fighter and civilian safety can be collected and shared between building and fire departments. As one example, building departments could notify fire departments when building permits are issued. This would result in fire departments being aware of these building alterations, and to possibly target these buildings for a pre-incident plan. Priority should be given to sharing such information for targeted hazards identified by fire departments.

Recommendation #4: Municipalities should consider conducting inspections on all commercial structures where a change of occupancy has occurred or renovations are known or suspected, giving special attention to non-sprinklered commercial retail structures

Discussion: Occupancy changes understandably occur with great frequency. However, every effort should be made as new permits are issued to aggressively inspect any occupancy change. It is critical that municipalities assess that any renovations or remodeling meets current codes, and that original and renovated supports are capable of supporting the new occupancies. These building inspections should specifically consider the loading or redistribution of stock to ensure that flooring can handle dead and live loads.

Other Links;

Albuquerque Fire Department; Learnings from Close Call Collapse and Fire Fighter Injuries

No comments

The Albuquerque Fire Department seeks to improve operations from past performance

Four firefighters with the Albuquerque (NM) Fire Department were injured during operations at a three-alarm fire that injured raged through the Royal Crown Apartment Complex  in southeast Albuquerque on Friday February 4, 2011.

The injured firefighters were among four who fell through the floor from the second story to the first while searching for residents of the, according to the Albuquerque Fire Department. Both suffered leg injuries, one had minor burn, and they were treated and released from University of New Mexico Hospital a few hours later, an AFD spokesperson said.

According to published reports at the time of the event, the first alarm came in at 3 p.m. bringing personnel and apparatus to the three-story building at 4801 Gibson SE. First units on the scene reported heavy smoke and flames on the north side of the building.

A crew from AFD Engine 13 entered the building and during a search rescued two uninjured residents from one apartment and also save a cat.

At 3:40 p.m. Incident command transitioned to a defense operations to fight the fire from outside the building. The third alarm was transmitted due to the projected heavy fuel load in the large complex.

Overall 75 fire personnel responded and operated at the alarm.

The fire is believed to have started behind a washing machine in the first-floor laundry room. An electric cause is suspected, but AFD said the exact cause is still under investigation.

The three-story multiple occupancy apartment complex was built in 1976 and housed 47 apartment units in 31,896 square feet of space.

In the months since the fire, the Albuquerque Fire Department has conducted a critique and post incident assessment of the operations, mayday and close-calls and overall performance of the department. As reported in the media video leading into this article, the department has taken the results of that post incident assessment and has developed training being delivered to al personnel to increase future operational performance, efficiencies and to reduce the likely hood of a similar event from occurring.

According to the Fire Department, they were playing catch-up from the early advancing stages of the incident and experienced difficulty in being able to make strategic strides to get ahead of the escalating incident severity, magnitude and rapid development.

The unexpected events leading to the multiple maydays and firefighter injuries challenged incident command and operations and could have resulted in possible multiple firefighter LODDs versus the close-call, near-miss events that subsequently lead towards the efforts to undertake  critical review of the incident and operations.

Some Insights and Learning’s from the Incident included that have resulted in enhancements;

  • Communications
  • Situational Awareness
  • Calling the Mayday
  • Radio Communications
  • Distractions and Error Prevention
  • Accountability
  • Command Response to Mayday Events
  • Communications Mayday Alerts

It is imperative that all departments initiate at the least a formal or informal post incident critique or review. This may be at the company or station level or escalated to a more formal department level assessment and review based upon the incident parameters and conditions.

The initiation and development of post incident analysis or assessment can be more involving and complex, with the commitment of personnel, resources and time but the benefits derived from such a review will contribute highly to the continued development and improvement of any organization. 

There are a number of recent after action, post incident or assessments reports that have been published and have been reviewed and discussed here on CommandSafety.com.

Take the time to review your incidents and runs at the company, station or battalion level. These reviews will identify and address low threshold, latent or emerging conditions before they escalate into apparent or root cause conditions that may contribute to significant adverse events and incidents.

The Albuquerque (NM) Fire Department’s self-critical review of this event has identified short comings at a number of levels that they are working to improve.

As they state in the video report, the outcome of this event could have been a lot worse than the injuries sustained and the resultant near-misses. The focus on improvements and enhancements within the functional areas of Calling the Mayday, Rapid Intervention and Mayday Communications and Operations is commendable and aligns with this year’s theme for Safety, Health and Survival Week.

The 2011 Safety Week theme is; Surviving the Fire Ground – Fire Fighter, Fire Officer and Command Preparedness.

  • Previous Safety Week announcement and details; HERE.
  • We’ll post under a separate article details on the IAFF Fire Ground Survival Program soon.

Albuquerque (NM) Fire Department’s Web Site, HERE

This year’s Safety Week will focus on delivering the online IAFF Fire Ground Survival (FGS) awareness training course to all fire departments. The program is the most comprehensive survival skills and MAYDAY prevention program currently available and is open to all members of the fire service. Additional planning tools and resources will be available on the Safety Week website.

The IAFF Fire Ground Survival Program (FGS) is the most comprehensive survival-skills and mayday-prevention program currently available and is open to all members of the fire service. Incorporating federal regulations, proven incident-management best practices and survival techniques from leaders in the field, and real case studies from experienced fire fighters, FGS aims to educate all fire fighters to be prepared if the unfortunate happens.

For links to the IAFF Fire Ground Survival Program, HERE and HERE

The program will provide participating fire departments with the skills they need to improve situational awareness and prevent a mayday. Topics covered include:

  • Preventing the Mayday: situational awareness, planning, size up, air management, fitness for survival, defensive operations.
  • Being Ready for the Mayday: personal safety equipment, communications, accountability systems.
  • Self-Survival Procedures: avoiding panic, mnemonic learning aid “GRAB LIVES”— actions a fire fighter must take to improve survivability, emergency breathing.
  • Self-Survival Skills: SCBA familiarization, emergency procedures, disentanglement, upper floor escape techniques.
  • Fire Fighter Expectations of Command: command-level mayday training, pre-mayday, mayday and rescue, post-rescue, expanding the incident-command system, communications.

Keep watching the website and the IAFC’s Facebook, Twitter and LinkedIn pages for continuing updates to this year’s program and planning resources.

Remember to visit the SHS Section’s website for more information on health and safety issues and the IAFF’s Health, Safety and Medicine’s website for more information on health, wellness and safety programs.

Additionally, look for a comprehensive series of articles, activities, insights, downloads, podcasts, video clips and resources that will be posted each day of Safety, Health and Survival Week here on Commandsafety.com, Thecompanyofficer.com and Buildingsonfire.com.

Announcements and campaign materials will begin posting in Mid-May.

We will be offering a special series of live shows nightly on Taking it to the Streets on Firefighternetcast.com and blogtalkradio during the week of June 19-25, 2011 addressing key issues with a stellar line-up of fire service leaders.

This will be an exceptional opportunity to listen in, call in and participate actively in the week’ theme of Surviving the Fire Ground – Fire Fighter, Fire Officer and Command Preparedness.

These shows will be mission critical. Stay Tuned for more upcoming information.

Be Self-Critical and a Learning Organization

  • In the meantime think about your operations; are you self-critical and a learning organization seeking to identify gaps or areas for improvement?
  • There is a lot that can be learned from our daily responses and operations, whether they be that single company response or that multiple alarm incident. 
  • All it takes is the recognition to see things for what they are and your may not be as good as you think and the understanding and desire to identify those conditions and improve .

 

Addtional Resources, videos and images related to the Albuquerque (NM) Fire Department’s operations at the Royal Crown Apartment Complex

Alpha Street Side View

 

Aerial View from the Delta Side

 

KASA News 13 photo by Alex Tomlin.

Double Mayday Deployments at Three Alarm FDNY Fire

1 comment

2 Firefighters Escape Close Call in Belle Harbor: MyFoxNY.com

Published reports from various NYC eMedia outlets indicated that two FDNY firefighters battling a three-alarm fire on Saturday April 9th in the Rockaways section of the Borough of Queens (NY) transmitted Maydays signals during fire suppression operations after a fire officer was partially trapped in a compromised  floor collapse and in another area of the occupancy a firefighter route was blocked due to fire extension resulting in the need to deploy this personal safety system (PSS)  to bail from a window. Reports indicated that FDNY Fire Lt. Richard Barnes fell through the second floor of the three-story Rockaways taxpayer building, but managed to hang on by his armpits until FAST firefighters could pull the 22-year veteran to safety, officials stated.

FDNY Firefighter Evan Davis transmitted a mayday signal when he was trapped by flames in another part of the building’s second floor, resulting in the eight-year veteran deploying his personal escape rope to lower himself out a window, unaware there was an adjacent roof less than 10 feet below.

  • The first mayday was transmitted 27 minutes into the operations, the second mayday was transmitted 43 minutes elapsed time into the operations
  • 10:36 hours – Duration 27 minutes elapsed incident time:  First Mayday, Trapped firefighter due to partial  floor collapse
  • Sixteen minutes later;
  • 10:54 hours – Duration 43 minutes elapsed incident time: Second Mayday, Firefighter bailout of window

A dozen of the 138 firefighters who responded to the fire suffered minor injuries.

Fire Officials reported the fire started about 10:oo hours near an oil burner in the basement of the building.

Read more: http://www.nypost.com/p/news/local/queens/close_call_for_qns_bravest_v120FHtVrYnSOlvMeile1L#ixzz1JAPLC1c6

The building (Fire Building) consisting of a single story commerical occupancy on the Alpha (street side) that was attached to a three story wood frame multiple occupancy (MO) structure 30 x 100 (ft)

From FirefighterSpot.com

 

Aerial From Bing Maps

 

Alpha Side Street View from GoogleStreets

 

Surrounding Properties consisted of the following based upon radio transmissions;

  • Exposure #1: Is a street
  • Exposure #2: Is a 2 Story Similar attach (structure)
  • Exposure #3: Is a Rear Yard
  • Exposure #4: Is an Alleyway

All – Hands transmitted:
7 – 5 – 1407 @ 10:19
Batt. 47 reports: Box 1407, All – Hands on arrival.
Extra Engine & truck. We have a heavy fire condition in a 3 Story Commercial.
Engine 309 & Lad. 134 are s/c

2nd Alarm:
2 – 2 – 1407 @ 10:21
Engs. 264, 328, 323
T. Lad. 153
Eng. 284 w / Satellite 4
Batt. 39 “Safety Officer”
Batt. 43 “Resource Unit Leader”
Rescue Battalion / Safety Battalion
Fieldcom 1 / Tactical Support Unit #2

Links and coverage;

Here’s the incident particulars based upon radio transmssions and transcript : From the Nassau FD Rant (HERE) NassauFDrant.com

  • FDNY Belle Harbor, Queens, New York April 9th, 2011
    Address: 424 Beach 129 st between Cronston and Newport Aves10:10 hours
    Phone Box 1407 – Report of fire in a restaurant
    Engs. 268, 329, 266
    L137, TL121
    Battalion 4710-75-1407 – 10:13 hours
    E265
    TL159 (FAST Truck)
    Battalion 33
    Division 13
    Squad 270
    Rescue 4

CIDS for 420 Beach 129 st:
Restaurant 1 story 30×100 class 3. Partial sprinkler siamese on exposure 1 for cellar and kitchen areas

7-5-1407 – 10:19 hours
Battalion 47: We have a heavy fire condition, extra engine and truck. All-Hands on Arrival.
E309, L134 S/C
RAC2

2-2-1407 – 10:19 hours
Engs. 264, 328, 323
E284 w/ Satellite 3
TL153
Battalion 39 (Safety Officer)
Battalion 43 (Resource Unit Leader)
Safety, Rescue Battalions
Tactical Support 2
FieldCom 1

10:23 hours – Duration 14 minutes
BC47: Box 1407, the address 424 Beach 129 st, we have fire on the 1st and 2nd floor extended to the 3rd floor, check the basement for extension. Exposure 1 is a street, 2 is a similar attached, 3 is a rear yard, 4 is an alley, k.

10:27 hours
TL157 S/C

10:29 hours
The staging area is Cronston Ave and Beach 131 st

10:29 hours – Duration 22 minutes
Division 13: 2nd Alarm Box 1407, we’ve got 4 lines stretched, 2 in operation, we have heavy fire on the 2nd floor of a 2 1/2 story commercial. You’ve got a 30×100, fire on the 2nd floor. 1st floor commercial occupancy, 2nd floor multiple dwelling, 3rd floor possibly apartments also.

10:31 hours – Duration 23 minutes
DC13: 2nd Alarm Box Box 1407, we have 4 lines stretched, 2 in operation. We’re going to change it from a 2 1/2 story to a 3 story building. Fire’s Doubtful, searches in progress, trucks are opening up, the 2nd Alarm is still Doubtful.

10:36 hours – Duration 27 minutes
DC13: 2nd Alarm Box 1407, a MAYDAY has been transmitted, the MAYDAY has been recovered and removed from the building. We put the FAST Truck to work, special call another FAST Truck. We’re Doubtful on the 2nd Alarm.
L173 (FAST Truck) S/C

10:38 hours – Duration 30 minutes
E321 S/C

3-3-1407 – 10:40 hours
Division 13 to Queens, URGENT, 3rd Alarm, as soon as you get the companies give me a rundown.
Engs. 254, 331, 225
Battalion 50
Battalion 58 (Staging Manager)
Battalion 42 (Air-Recon Chief)
Mask Service Unit
Car 4A( AC James Manahan, Assistant Chief of Operations)

10:41 hours
Car 1E (Commissioner’s Liaison) is responding

10:52 hours
Car 36A (Department Chaplain) is responding

10:54 hours – Duration 43 minutes
DC13: 3rd Alarm Box 1407, we had a 2nd MAYDAY, he used his PSS to escape the building.

10:55 hours
Car 11A (BC Thomas J. Richardson, Chief of Rescue Operations) is responding

11:00 hours – Duration 52 minutes
FieldCom: Progress report on the Queens 3rd Alarm Box 1407, the address 424 Beach 129 st near Cronston Ave, fire on the 2nd and 3rd floor of a 3 story commercial 30×100. Division 13 reports he has 6 handlines stretched in operation, truck companies continuing to open up and they’re in the process of setting up the tower ladder operation. Fire is Doubtful.

11:14 hours – Duration 1 hour 5 minutes
FC: Special call 1 additional truck, have them respond to the staging area.
TL107 S/C

11:18 hours – Duration 1 hour 9 minutes
FC: Progress report on the 3rd Alarm Box 1407, at this time Car 4A, Assistant Chief Manahan reports: a roll call has been conducted and all members are accounted for. Members have been backed out of the building and a tower ladder operation is in progress, and the fire remains Doubtful.

11:20 hours – Duration 1 hour 11 minutes
FC: Notify the Buildings Dept. to respond, they want to check the stability of the building.

11:25 hours
FC: By authority of the Incident Commander you can 10-2 the Air-Recon Chief.

11:27 hours – Duration 1 hour 18 minutes
FieldCom requests mixer-off message

11:33 hours – Duration 1 hour 24 minutes
FC: Progress report on the 3rd Alarm Box 1407, at this time Car 4A, Chief Manahan reports that they have 4 handlines in operation, they have 1 tower ladder in operation on exposure 1. Conditions remain the same and searches will be delayed. Fire remains Doubtful.

11:58 hours – Duration 1 hour 49 minutes
FC: Progress report on the 3rd Alarm Box 1407, at this time Car 4A, Chief Manahan reports that the safety chief is going to enter the building to assess the stability, searches are delayed, and the fire is now Probably Will Hold.

12:02 hours
Car 14C (Fire Marshal) is 10-84

12:09 hours
Car 14 (Chief Fire Marshal Robert Byrnes) is 10-84

12:11 hours
Car 4A is 10-8, Division 13 is Incident Commander.

12:32 hours – Duration 2 hours 23 minutes
FC: Progress report on Box 1407, primary searches on the 2nd and 3rd floors are complete and negative, k, the secondaries are in progress.

12:36 hours – Duration 2 hours 27 minutes
FC: Progress report on the 3rd Alarm Box 1407, Division 13 reports: The primary searches throughout the fire building are complete and negative, the secondaries are underway, and the fire is Under Control.

Relocations
Engines: 275/265, 319/266, 233/329, 259/331
Ladders: 155/121, 135/155, 150/134, 120/137, 125/173
Battalions: 48/43, 51/47, 52/51


FDNY Radio Codes HERE

Taking it to the Streets: Near Miss Reporting and One Captain’s Close Call

No comments

Taking it to the Streets: Near Miss Reporting and One Captain’s Close Call

On Your Street, In Your City, Across the Country, Around the WorldTM    

 
 
 
 Join us on Wednesday night March 16th at 9:00 pm ET for an insightful discussion on the National Near-Miss reporting System with a stellar line-up of fire service leaders.

The line-up of Scheduled guests includes,    

  • Lt. Steve Mormino, FDNY (ret),
  • Captain CJ Haberkorn Denver (CO) Fire Department and
  • Special Guest Captain Michael Long, Camp Taylor (KY) Fire Protection District.

 Grab a cup of coffee and sit down for a special two part, two hour program with Taking it to the Streets on Firefighernetcast.com where we’ll be discussing the National Near-Miss Reporting System and the untapped resources that the program and system provides with Christopher Naum and this outstanding group of fire service leaders.    

The second part of the program will dedicated to the personal account of Captain Long’s Close Call event from July 25, 2010 (NMR #10-1072) when a catastrophic floor collapse at a residential occupancy plunged him into a fire involved basement.    

 
 

Join in on the live open discussion with other fire service personnel from around the country. Check out the latest downloads of recent programs in the archives by visiting Taking it to the Street’s webpage on Firefighternetcast.com or for program insights at CommandSafety.com.    

  • Tune in to the Program Wednesday evening March 16th at 9:00 pm ET, HERE
  • Firefighternetcast.com HERE
  • Taking it to the Streets Radio Programs, HERE and HERE 
  • National Near Miss Reporting System, HERE
  • National Near Miss Reporting System Resources, HERE
  • National Near Miss Reporting System, 2011 Calendar and Annual Report, HERE
  • One Captain’s Personal Near Miss Event, HERE
  • Incident Posting from Commandsafety.com from 2010, HERE

Taking it to the StreetsTM is a monthly radio show featured on BlogTalk Radio and is hosted by Christopher Naum and is a Buildingsonfire.com Series and FireFighternetcast.com Production,    

© 2011 All Rights Reserved     

    

 

  

   

The Ides of March

No comments
  
Operational Safety

Here are five (5) NIOSH Firefighter LODD Event report summaries for incidents that occurred in the March 4th through the 8th time frame in the years 1998, 2001, 2002, 2008.   

Take the time to look over the event summaries, discuss and comment on the factors that lead to the events and the recommendations formulated from the subsequent investigations.   

Take the opportunity to identify the common themes and apparent causes that were identified and discuss with your company, team or station, relevant considerations that may have a direct or indirect relationship to your organization, past incident calls or district risk profile.   

What are your capabilities?   

What are your gaps?   

How can you prevent a similar situation from occurring?

    

Promote questions and dialog related to operational issues such as these;   

  • Coordinated multi-company operations; how “coordinated” is your incident scene?
  • Do rapidly changing incident conditions get identified promptly and communicated to Command in rapid succession for actions?
  • How effective is the base line knowledge and skill set of company and command officers in “reading the building”?
  • What is the adequacy of your training for conducting operations above the fire floor?
  • When was the last time you “tested” the effectiveness of your RIT/FAST Team? Can they truly perform under the most demanding of incident conditions?
  • When was the last time you trained or drilled on Fire Behavior or on Building Construction?
  • Are you training on calling the mayday and personal survival techniques?
  • Have you implemented and trained on procedures for rapid and efficient transition in operational modes on the fireground?
  • Do you implement a 360 when applicable?

Down load the complete NIOSH Reports and expand on the lessons learners and their applicably to your organization and capabilities.    

Manlius, New Yrok

Floor Collapse and Fire Conditions:
On March 7, 2002, a 28-year-old male volunteer fire fighter and a 41-year-old male career fire fighter died after becoming trapped in the basement. One firefighter manned the nozzle while second firefighter provided backup on the handline as they entered the house. After entering the structure, the floor collapsed, trapping both victims in the basement.   

A career fire fighter captain joining the fire fighters near the time of the collapse was injured trying to rescue one of the fire fighters. Crew members responded immediately and attempted to rescue the victims; however, the heat and flames overcame both victims and eliminated any rescue efforts from the garage entrance.   

NIOSH investigators concluded that, to minimize the risk of similar occurrences, fire departments should;
   

  • Ensure that the Incident Commander is clearly identified as the only individual responsible for the overall coordination and direction of all activities at an incident
  • Ensure that the Incident Commander conveys strategic decisions to all suppression crews on the fireground and continually reevaluates the fire condition
  • Ensure that Incident Command conducts an initial size-up of the incident before initiating fire fighting efforts and continually evaluates the risk versus gain during operations at an incident
  • Ensure that fire fighters from the ventilation crew and the attack crew coordinate their efforts
  • Ensure that fire fighters report conditions and hazards encountered to their team leader or Incident Commander
  • Ensure fire fighters are trained to recognize the danger of operating above a fire

NIOSH REPORT: http://www.cdc.gov/niosh/fire/reports/face200206.html    

    

Wall Collapse and Fire Conditions
On March 7, 2008, two male career fire fighters, aged 40 and 19 were killed when they were trapped by rapidly deteriorating fire conditions inside a millwork facility in North Carolina. The captain of the hose line crew was also injured, receiving serious burn injuries.   

The victims were members of a crew of four fire fighters operating a hose line protecting a firewall in an attempt to contain the fire to the burning office area and keep it from spreading into the production and warehouse areas. The captain attempted to radio for assistance as the conditions deteriorated but fire fighters on the outside did not initially hear his Mayday. Once it was realized that the crew was in trouble, multiple rescue attempts were made into the burning warehouse in an effort to reach the trapped crew as conditions deteriorated further.   

Three members of a rapid intervention team (RIT) were hurt rescuing the injured captain. One firefighter was located and removed during the fifth rescue attempt. The second firefighter could not be reached until the fire was brought under control.   

The fourth crew member had safely exited the burning warehouse prior to the deteriorating conditions that trapped his fellow crew members. Key contributing factors identified in this investigation include radio communication problems (unintelligible transmissions in and out of the fire structure that may have led to misunderstanding of operational fireground communications), inadequate size up and incomplete pre-plan information, a deep-seated fire burning within the floor of the office area that was able to spread into the production and warehouse facility, the procedures used in which operational modes were repeatedly changed from offensive to defensive, lack of crew integrity at a critical moment in the event, and weather which restricted fireground visibility.   

NIOSH investigators concluded that, to minimize the risk of similar occurrences, fire departments should:   

  • Ensure that detailed pre-incident plan information is collected and available when needed, especially in high risk structures
  • Limit interior offensive operations in well-involved structures that are not equipped with sprinkler systems and where there are no known civilians in need of rescue
  • Develop, implement, and enforce clear procedures for operational modes. Changes in modes must be coordinated between the Incident Command, the command staff and fire fighters
  • Ensure that Rapid Intervention Crews (RIC) / Rapid Intervention Teams (RIT) have at least one charged hose line in place before entering hazardous environments for rescue operations
  • Ensure that the incident commander establishes the incident command post in an area that provides a good visual view of the fire building and enhances overall fireground communication
  • Ensure that crew integrity is maintained during fire suppression operations
  • Encourage local building code authorities to adopt code requirements for automatic protection (sprinkler) systems in buildings with heavy fire loads.

NIOSH REPORT http://www.cdc.gov/niosh/fire/reports/face200807.html    

  

Floor Collapses in Residential Fire - North Carolina

    

Floor Collapse
On March 4, 2002, a 22-year-old male career fire fighter was injured and subsequently died and a 25-year-old male Captain was injured when the floor collapsed while they were fighting a residential fire.   

The Captain was transported by ambulance to an area hospital where he was admitted overnight for first- and second-degree burns. The victim was conscious and was transported by medical helicopter to a State medical center where he died 2 days later.   

NIOSH investigators concluded that, to minimize the risk of similar occurrences, fire departments should;   

  • Ensure that each Incident Commander conducts a size-up of the incident before initiating fire-fighting efforts, after command is transferred, and continually evaluates the risk versus gain during operations at an incident
  • Ensure fire fighters are trained to recognize the dangers of searching above a fire
  • Ensure that an Incident Safety Officer, independent from the Incident Commander, is appointed
  • Ensure that ventilation is closely coordinated with fire attack
  • Ensure that a Rapid Intervention Team is established and in position immediately upon arrival
  • Ensure that adequate numbers of staff are available to operate safely and effectively

NIOSH REPORT http://www.cdc.gov/niosh/fire/reports/face200211.html   

    

Fall Through Floor Fighting a Structure Fire at a Local Residence - Ohio

     

Floor Collapse
On March 8, 2001, a 38-year-old male career fire fighter fell through the floor while fighting a structure fire, and died 12 days later from his injuries. At 1231 hours, Central Dispatch notified the career department of a structure fire with reports of the occupants still inside. The Assistant Chief arrived on the scene along with Engine 70 and assumed Incident Command (IC).   

The IC immediately called for the second alarm, began conducting the initial size-up of the structure, and confirmed heavy fire in the left front section. At that time, the neighbors approached the IC and informed him that the occupants were trapped inside. The IC ordered the fire fighters on scene to commence search and rescue efforts, and then verified the stability of the structure through radio and face-to-face communications.   

Engine 68 arrived on the scene at approximately 1250 hours with an Assistant Chief and the victim. The Assistant Chief provided tactical command of the fire ground, and along with the victim, conducted search and rescue operations. Other crews conducted searches with a thermal imaging camera of the first floor and basement level of the residence with no sign of any occupants. During these searches the stability of the structure was diminishing due to the intense fire that was now venting through the roof.   

Fire fighter #3 and the victim were at the front entrance conducting a defensive attack as the third emergency evacuation signal was sounded. The neighbors were still insisting to the IC and fire fighters that the occupants were trapped inside, and one of the occupants was handicapped. The victim and one other fire fighter conducted another search of the structure.   

The heat and flames were now extending from the basement level to the first floor when the fire fighter’s low air alarm sounded. The victim and the fire fighter were backing out of the structure when the floor beneath the victim gave way, causing him to fall through the floor and become trapped in the basement.   

Attempts were made from the first floor to rescue the victim by utilizing a handline and an attic ladder, but they were unsuccessful due to the intense heat and flames. Two Rapid Intervention Teams (RIT #1 & RIT #2) were deployed simultaneously from separate entrances into the basement to perform a search and rescue operation for the downed fire fighter. The RITs were able to locate and remove the victim on their initial entry. He sustained third degree burns to over half of his body and died 12 days later.   

NIOSH investigators concluded that to minimize the risk of similar occurrences, fire departments should;   

  • Ensure that Incident Command continually evaluates the risk versus gain during operations at an incident
  • Ensure that a separate Incident Safety Officer independent from the Incident Commander is appointed
  • Ensure that fire fighters are trained in the tactics of defensive search
  • Ensure that fire fighters performing fire fighting operations under or above trusses are evacuated as soon as it is determined that the trusses are exposed to fire
  • Ensure consistent use of Personal Alert Safety System (PASS) devices at all incidents and consider providing fire fighters with a PASS integrated into their Self-Contained Breathing Apparatus which provides for automatic operation
  • Ensure that personnel equipped with a radio, position the radio to receive and respond to radio transmissions

NIOSH REPORT: http://www.cdc.gov/niosh/fire/reports/face200116.html    

    

     

Roof Collapse and Fire Conditions
On March 8, 1998, one male fire fighter, the Captain on Engine 57, died while trying to exit a commercial structure after his egress was cut off by the wooden trussed roof that collapsed. Task Force 66 was the first on scene and reported light smoke showing from a one-story commercial building. A ventilation team from Truck 66 proceeded to the roof of the building and commenced roof ventilation. Forcible entry into the building required about 7 ½ to 9 ½ minutes from arrival on scene to force open the two metal security doors in the front. While fire companies waited for the security doors to be opened, fire conditions changed dramatically on the roof.   

Fire was coming from the ventilation holes opened by the ventilation crew. As soon as the security doors were opened, three engine crews (Engine 66, Engine 57, and Engine 46) advanced hand lines through the front door in an attempt to determine the origin of the fire. Approximately 15 feet inside the front door, the fire fighters encountered heavy smoke with near zero visibility conditions. The engine crews advanced their hose lines approximately 30 to 40 feet inside the building.   

As conditions continued to deteriorate inside the building, the members from the four engine companies involved in the fire attack began to withdraw. During this time the victim became separated from his crew and remained in the building. The victim was subsequently located by the Rapid Intervention Team and cardiopulmonary resuscitation was performed immediately and en-route to the hospital, where the victim was pronounced dead.   

NIOSH investigators conclude that, to prevent similar occurrences, fire departments should:    

  • Ensure that incident command conducts an initial size up of the incident before initiating fire fighting efforts, and continually evaluate the risk versus gain during operation at an incident
  • Ensure that incident command always maintains close accountability for all personnel at the fire scene
  • Ensure communications are established between the interior and exterior attack crews, e.g., the ventilation crew and the interior fire attack crew should communicate conditions among themselves and back to incident command
  • Ensure that Rapid Intervention Teams are in place before conditions become unsafe
  • Ensure that some type of tone or alert that is recognized by all fire fighters be transmitted immediately when conditions become unsafe for fire fighters
  • Ensure sufficient personnel are available and properly functioning communications equipment are available to adequately support the volume of radio traffic at multiple-responder fire scenes
  • Consider placing a bright, narrow-beamed light at the entry portal to a structure to assist lost or disoriented fire fighters in emergency egress.

NIOSH REPORT: http://www.cdc.gov/niosh/fire/reports/face9807.html    

  

Stay tuned for upcoming announcements for the March 16th Taking it to the Streets Program on Firefighternetcast.com

  

Taking it to the Streets on Firefighternetcast.com

Taking it to the StreetsTM  

Featuring a two part program on Near Miss Firefighter Reporting with Lt. Steve Mormino, FDNY (ret) and Capt. CJ Haberkorn, Denver (CO) Fire Department and joing us on the second part of the program will be special guest, Captain Michael Long, with a personal Near-Miss Event account you won’t want to miss. 

Join in on the live open discussion with fire service personnel from around the country. 

Check out the latest downloads of recent programs in the archives by visiting Taking it to the Street’s webpage on Firefighternetcast.com or for program insights at CommandSafety.com. 

  • Tune in to the Program Wednesday evening March 16th at 9:00 pm ET on Firefighternetcast.com HERE 
  • Taking it to the Streets Radio Programs, HERE and HERE 

Taking it to the StreetsTM is a monthly radio show featured on BlogTalk Radio and is hosted by Christopher Naum and is a Buildingsonfire.com Series and FireFighternetcast.com Production, © 2010-2011 All Rights Reserved

Engineered Floor I-Joists and Firefigher Safety: Basic Insights

1 comment

The following videos provide some Basic insights on Engineered Floor I-Joists and Firefighter Safety. The first two video reports are a few years old, but provide some good visual and narrative insights into the current building construction trends, operational limitations and fireground tactical safety considerations.  

Take the time to review these video clips and gain some new insights or refresh and reinforce your past knowledge of engineered floor systems, assemblies and tactical safety considerations. References and links to mission critical reports, studies and incidents is provided for your to expand your knowledge and skill base; for every rank and level of operations from firefighter, company or command officer.  

   

   

   

Some insights on Engineered I-Joist construction and uses from a manufacture’s perspective….  

   

Some insights on a newer type of I-Joist Hanger System interated into an Insulated concrete formwork system (ICF)
   

Cut-outs in I Joists for HVAC runs
   

If you’ve been paying attention to the latest news and on the job reports the past two month, you should have noticed there’s been an adverse emerging trend evident in near miss, close-calls resulting in maydays, RIT deployments and self-rescue resulting from floor compromise and floor collapse.I previously posted some research and links related to the first one or two events on Buildingsonfire on Facebook  HERE, It became evident that there was an immediate opportunity to get some learning’s and insights out. 

If you have a chance head over to Facebook and link into Buildingsonfire and check out the incident links posted as well as some immediate report links from the December/January time frameIn the meantime here are some links I pulled together that you should take the time to read and share with your companies, personnel and staff…..Take the time to have a ten minute drill on these events as Operating Expeeince (OE) on floor systems and operational safety with your company, station or department.Take a look at your current SOP and SOG’s and determine if you have the right “stuff” in place to provide operational guidance and direction based upon your organization’s operational profile and capabilites.Is your training up to speed on size-up, risk profiling and command and compay level operations for conducting work at buildings and occupancies with actual or suspected engineered floor systems?Reference Links for Operational Insights and Operating Experience (OE)

Here’s some screen shots from Buildingsonfire on Facebook. Go HERE or follow the link at the left column. Join the growing list of 3700 fans with Buildingsonfire on Facebook and Buildingsonfire.com   

  

UL Testing

  

UL Fire Academy CBT  

  • UL Structural Stability of Engineered Lumber in Fire Conditions
  • This two-hour presentation summarizes a research study on the hazards posed to firefighters by the use of lightweight construction and engineered lumber in floor and roof designs. This free on-line computer based presentation will allow fire professionals to better interpret fire hazards and assess risk for life safety of building occupants and firefighters.
  • This online firefighter training course is the result of a research partnership among UL, the Chicago Fire Department, IAFC, and Michigan State University, funded in part by the U.S. Department of Homeland Security. This self-guided course, which focuses on the structural stability of engineered lumber under fire conditions, is targeted toward the 1.1 million fire service personnel in the United States and Canada. The knowledge developed and shared in this course is critically important to firefighter and civilian safety.
  • This two-hour presentation summarizes a research study on the hazards posed to firefighters by the use of lightweight construction and engineered lumber in floor and roof designs. This free on-line computer based presentation will allow fire professionals to better interpret fire hazards and assess risk for life safety of building occupants and firefighters.
  • Program Objectives:
  • Provide brief history of events leading up to DHS Grant tests
  • Identify the fire test hypothesis, parameters, and steps completed in the testing process
  • Compare tests results (legacy vs. modern construction)
  • Communicate learnings from our partners representing the fire service
  • Discuss code recommendations
  • UL University on-line Program HERE

Here’s a link to a past informative posting related to engineered systems and their relationship to firefighter safety and operations, HERE. There’s some great contributed information and manufacturer “insights” on the subject engineered wood I-joists and beams and firefighter safety. There are some interesting statistical extrapolations, correlations and conveniences’ that attempt to make the case. But then again, You be the judge. Take at look at the presentation developed by the American Forest and Paper Association, HERE and HERE.  

If you haven’t done so yet, don’t forget to check out the free online training program on Structural Stability of Engineered Lumber in Fire Conditions at the UL University developed and provided by Underwriter’s Laboratories (UL),  HERE   

Here’s an additional series of other important Reference Links that provide some insights on operational safety, incident conditions and factors ;   

  • NIOSH Publication No. 2009-114: Preventing Deaths and Injuries of Fire Fighters Working Above Fire-Damaged Floors HERE
  • NIOSH Publication No. 2005-132: Preventing Injuries and Deaths of Fire Fighters Due to Truss System Failures HERE
  • NFPA Report on Light Weight Construction, HERE
  • Informative USFA Coffee Break series postings related to Building Types & Fire Resistance:  HERE. HEREHERE, HERE, and HERE
  • Remember, Building Knowledge = Firefighter Safety (Bk-F2S)

Buildingsonfire.com and the Command Institute

  

Coming Spring 2011

We’re finishing up with the content development and working on the supportive case studies and interactive group activities for an exciting new one day seminar program on that will address the leading issues, studies and reports specific to engineered floor and roof systems, incorporating the lastest UL and NIST test data and insights with cutting edge methodolgies and practices for firefighting operations.  

  • Engineered Structural Systems & Fireground Operations will be available for training bookings commencing in May 2011. Contact us for a new brochure and program details.

In addition, look for a new updated 2011 Training Seminar brochure to download with a series of revised training seminars incorporating the newest operational insights  

  • Building Construction for the Command & Company Officer
  • Building Construction and Tactical Operations
  • Tactical Operations and the New Rules of Combat Fire Engagement
  • Dynamic Risk Assessment of Occupancies for Operational Safety
  • Reading the Building: Predictive Profiling Predictive Occupancy Profiling

Near-Misses, Maydays and Floor Collapses

4 comments

Do you know what's underneath you as you're making entry?

If you’ve been paying attention to the latest news and on the job reports these past few days, you may have noticed there’s been an emerging trend evident in near miss, close-calls resulting in maydays, RIT deployments and self-rescue resulting from floor compromise and floor collapse. 

As I was doing some research and posting links related to the first one or two events on Buildingsonfire on Facebook, HERE, it became evident that there was an immediate opportunity to get some learning’s and insights out. If you have a chance head over to Facebook and link into Buildingsonfire and check out the incident links posted as well as some immediate report links.

I’ll plan to develop some operational safety and awareness insights related to building construction, floor systems and operational integrity in the next few days. I’ll get a comprehensive list of events and incident parameters compiled and posted also.

In the meantime here are some links I pulled together that you should take the time to read and share with your companies, personnel and staff…..

This seems like a good time to have a ten minute drill on these events as Operating Expeeince (OE) on floor systems and operational safety.

Reference Links for Operational Insights and Operating Experience (OE)

Here’s some screen shots from Buildingsonfire on Facebook. Go HERE or follow the link at the left column. Join the growing list of 3500 fans with Buildingsonfire on Facebook and Buildingsonfire.com (fully launching in January, 2011)

Operational Safety at Basement Fires: Close Call

4 comments

Basement fires in both residential and commercial occupancies are one of the most challenging tactical operations that present numerous risk factors that required the highest degree of situational awareness, training skill sets and continuous incident monitoring and assessment to gauge building structural integrity, fire behavior and crew integrity and performance. 

An explosion rocked a Fairdale, Kentucky neighborhood this past weekend while the homeowner was in the process of doing remodeling his basement. A Camp Taylor (KY) firefighter survived a floor collapse that momentarily trapped him proximal to the seat of a working basement fire. Camp Taylor (FD) Captain Mark Long sustained second and third degree leg burns after falling through the floor of the burning home and subsequently being rescue by other fire department personnel. 

Fellow firefighters, including his brother-in-law, who was right behind him prior to his fall, were yelling and screaming at Long to hang on.  They managed to get a ladder to the basement and it was up to Long to find the strength to get out.  He says “I started to try to climb up. I got two, I lost my grip, fell flat into the fire.  I was so exhausted.” On his third attempt, he did find the strength and pulled himself up the ladder and out of the flames.  

According to published reports a coordinated fire suppression effort was undertaken, with heavy fire involvement extending throughout the house and into the roof area. Interior fire attack was commenced, and as crews began moving across the first floor area above the seat of the fire, the floor subassembly failed causing an isolated collapse and compromise of the structural floor system and sub-floor decking, resulting in Captain Long falling into the basement. The fire originating in the basement was the result of the homeowners’ use of acetone as a floor treatment when the chemical vapors were ignited by the hot water heater causing an explosion and resulting fire. 

Safety Considerations related to Residential Occupancies (non-inclusive) 

  • Conduct a thorough fire size-up and communicate the findings to all personnel on-scene before entering the building.
  • Conduct an assessment of the Building Profile ( building construction type, structural assembly systems and features and age) and assesss fire behavior and intensity levels.
  • Ensure an adequte Risk Assessement is conducted and that Risk versus Gain is determined
  • Maintain situational awareness throughout the tactical deployment of crews within the interior of the structure
  • Conduct a 360 degree perimeter assesement when feasible to determine access and egress points, fire location and travel and other mission critical operational perameters.
  • Incident commanders and company officers should be trained and experienced in structure fire size up to avoid putting fire fighters at unneeded risk of working above fire-damaged floors.
  • Do not enter a structure, room, or area when fire is suspected to be directly beneath the floor or area where fire fighters would be operating, or if the location of the fire is unknown.
  • Never assume structural safety of any floor (regardless of the construction) having a significant fire under it.
  • Conduct pre-incident planning inspections during the construction phase to identify the type of floor construction.
  • If pre-planning is not conducted, assume residential construction and small commercial buildings built since the early 1990s may contain engineered wood I-joists.
  • Report construction deficiencies noted during preplanning to local building code officials. For example, engineered wood floor joists should only be modified per manufacturer specifications—usually limited to cutting to length and removing pre–cut knockouts for utility access. Report damaged or cut chords or webs to building officials.
  • Develop, enforce, and follow standard operating procedures (SOPs) on how to size up and combat fires safely in buildings of all construction types. Rapid intervention teams (RIT) should include a portable ladder with their RIT equipment when deployed at basement fires.
  • Ensure Time Compression is considered: Ensure Command has the ability to monitor progress or elapsed incident time and adjusts strategic and tactical plans accordingly and in a time effective manner. 
  • Provide training on identifying signs of weakened floor systems (soft or spongy feel, heat transmitted through floor, downward bowing, etc.).
  • Make fire fighters aware that all floor types can fail with little or no warning.
  • Use a thermal imaging camera to help locate fires burning below or within floor systems, but recognize that the camera cannot be relied upon to assess the strength or safety of the floor. (Refer to the recent UL Test Data and Operational Safety Considerations ”Structural Stability of Engineered Lumber in Fire Conditions” available at http://www.uluniversity.us/ )
  • Fire fighters should be trained on the use of thermal imaging cameras, including limitations and difficulties in detecting fire burning below floor systems. (See reference to UL above)
  • Immediately evacuate and, if possible, use alternate exit routes when floor systems directly beneath the floor where fire fighters would be operating are weakened by fire.
  • Use defensive overhaul procedures after fire extinguishment in structures containing fire-damaged floor systems of all types.
  • Consider becoming active in the building code process and influence requirements for fire resistance of floor and ceiling systems to further fire fighter safety and health.
  • Ensure RIT personnel area staged and have complete a site assessment of the building and occupany upon thier arrival and set-up
  • Ensure that a rapid intervention team (RIT) is on the scene as part of the first alarm and in position to provide immediate assistance prior to crews entering a hazardous environment

Here are some resources and case studies resulting from operations at floor collapses;

Incident links; HERE, HERE, HERE and HERE 


 

Eleven Minutes to Mayday; What You Need to Know

12 comments

The Colerain Township (OH) Fire and EMS Department under the leadership of Director and Chief G. Bruce Smith recently released its final report Investigation Analysis of the Squirrels nest Lane Firefighter Line of Duty Deaths related to the April 4, 2008 Double Line of Duty Death of a Captain and Firefighter.  This investigative analysis and report, although specific to the events and conditions encountered during the conduct of operation at the residential occupancy at 5708 Squirrels nest Lane has pertinent and relevant insights, recommendations and factors that all Fire Service personnel, regardless of rank should read.

This is one of those distinctive reports that has influential and critical operational, training and preparedness elements embedded throughout the report. Following my review of the report, having previously read the preliminary report findings, it is apparent there continues to be common threads shared by this and other events and incidents where a single of multiple firefighters have lost their lives due to similarities in the apparent and common cause deficiencies and short comings identified.

All company and command officers should read and comprehend the lessons learned. Then, take these new found insights and see what the gaps are at the personal level (yours or those you supervise) as well as the shift, group, station, battalion, division or department as a whole. If there are gaps, then identify a way to implement timely changes as necessary so there are No History Repeating (HRE) events.

I have provided a comprehensive synopsis of the report for your review. Take the time to read the entire report, make the time to improve where you need to.  

On Friday, April 4, 2008 at 06:13:02 hours, what began as a routine response for Colerain Township Fire and EMS Engine 102 to investigate a fire alarm activation at 5708 Squirrels nest Lane, Colerain Township, Ohio resulted in the deaths of Colerain Township Captain Robin Broxterman and Firefighter Brian Schira.

Upon their arrival at the scene of the two-story wood framed, residential building working fire conditions existed in the basement. The initial attack team consisted of Broxterman, Schira, and one other firefighter. The team advanced a 1¾-inch attack hose line through the interior of the building for fire control.

Even though, they were provided with some of the most technologically advanced protective clothing for structural firefighting and self-contained breathing apparatus, it appeared that Broxterman and Schira were overwhelmed by severe fire conditions in the basement. 

During their attempt to evacuate the building, the main-level family room flooring system in which the two were traveling on collapsed into the basement trapping the firefighters. Eleven minutes elapsed from time of arrival to the catastrophic chain of events.

The investigation of this incident provided a number of findings and recommendations that should be considered by Colerain’s fire department, as well as other fire department organizations. The examination encompassed issues that related to building construction, firefighting tactics, command and control, situational awareness, communications, training, firefighting equipment and the individual responsibility of firefighters of the Colerain Township Department of Fire and Emergency Medical Services (Colerain Fire & EMS). In addition, a segment of the examination included a review of the individual and group affects following such an event, and the measures initiated that attempted to ensure individual, family and organizational wellness.

The following factors were believed to have directly contributed to the deaths of Captain Broxterman and Firefighter Schira:

  • A delayed arrival at the incident scene that allowed the fire to progress significantly;
  • A failure to adhere to fundamental firefighting practices; and
  • A failure to abide by fundamental firefighter self-rescue and survival concepts

 Although the aforementioned factors were believed to have directly contributed to their deaths, they might have been prevented if:

  • Some personnel had not been complacent or apathetic in their initial approach to this incident;
  • Some personnel were in a proper state of mind that made them more observant of their surroundings and indicators;
  • The initial responding units were provided with all pertinent information in a
  • timely manner relative to the incident;
  • Personnel assigned to Engine 102 possessed a comprehensive knowledge of their first-due response area;
  • A 360-degree size-up of the building accompanied by a risk – benefit analysis
  • was conducted by the company officer prior to initiating interior fire suppression operations;
  • Comprehensive standard operating guidelines specifically related to structural
  • firefighting existed within the department;
  • The communications system users (on-scene firefighters and those monitoring the incident) weren’t all vying for limited radio air time;
  • The communications equipment and accessories utilized were more appropriate for the firefighting environment;
  • Certain tactical-level decisions and actions were based on the specific conditions;
  • Personnel had initiated fundamental measures to engage in if they were to become disoriented or trapped inside a burning building; and
  • Issued personal protective equipment was utilized in the correct manner.

 Incident Reported

On Friday, April 4, 2008, at 06:11:23, the Hamilton County Communications Center (HCCC) received notification of an automatic alarm activation (smoke detector and carbon monoxide) at 5708 Squirrels nest Lane (LN).

  • An automatic fire alarm response complement of two engine companies (Engines 102 & 109), one ladder company (Ladder 25), and the Battalion Chief (District 25) were dispatched to investigate at 06:13:02.
  • At 06:13:43, a second notification was received from the female homeowner reporting a fire in the basement of the building.
  • At 06:20:43, a third notification by means of a cellular phone from the female homeowner to HCCC routed through the City of Cincinnati’s Fire and Police Communications Center was received.
  • At 06:22:41, the initial response complement was then upgraded to a building fire, also known as a structure fire response complement to include one additional engine company (Engine 25), one rescue company (Rescue 26), and one basic life support transport unit (Squad 25).

Property and Building Description: The building at 5708 Squirrels nest LN was a single-family residence that set back approximately 450-feet from the street at the end of a private driveway on a heavily wooded lot.

  • The building was two-stories in height, approximately 45-feet wide by 30-feet deep with a finished below-grade (basement) living space and attached two-car garage.
  • For simplicity, the report refers to the living space under the main-level of the building as a basement.
  • From the front (side Alpha), the building was two-stories above grade. The vertical distance between floors was approximately eight-feet. The exterior main entrance was located in the front middle of the building approximately one-foot above grade level.
  • Additional entrances to the first-floor living space were by means of a rear entry door from an upper-level deck area and through the garage area.
  • The interior stairway to the basement was located approximately 15-feet from the front main entry door towards the rear of the building. There were no exposed buildings on the adjacent sides of the fire building.

The building was located approximately 450-feet from the curb and a driveway leading to the front entrance. The nearest fire hydrant was located approximately 500- feet from the front entrance. To provide for uniform identification of locations and operationalforces at the incident scene, the scene was divided geographically into smaller parts, which were designated as sectors. Specific areas of the incident scene were designated as follows:

  • The side of the building that bears the postal address of the location was designated as Side Alpha or front by the Incident Commander;
  • The property sloped downward towards the rear (side Charlie) of the building with an approximate 13-foot elevation difference from side Alpha to Charlie. The
  • Charlie side of the building was three-stories above the rear grade level with the building’s basement floor approximately five-feet above grade level. The exterior entrance to the building’s’ basement area, also known as a walk-out was by means of a stairway that led to a wooden deck on the Charlie side adjacent to the Delta side. A second stairway led to an upper level deck that served the main level of the building.

 

Initial Fire Attack Operation: Upon arrival at the incident address, Engine 102 (E102), assigned four personnel (one captain, one fire apparatus operator [FAO], and two firefighters) entered and proceeded down the driveway deploying a five-inch supply hose line.

  • With their apparatus positioned in front of the building Captain (Capt.) Broxterman radioed, “Moderate smoke showing. E102 will be Squirrelsnest Command.” at 06:24:01.
  • Verification was made by the E102’s FAO through face-to-face communication with the male homeowner that all occupants were out of the building, which was then relayed to Capt. Broxterman.

District 25 (D25) arrived at the scene at 06:26:35 and assumed Command from Capt. Broxterman. Capt. Broxterman, Firefighter (Ffr.) Schira and E102’s Ffr. #2 advanced a 1¾-inch pre-connected hose line through the front main entrance. The fire was determined to be located in the basement of the building.

  • At 06:27:52, Capt. Broxterman radioed, “E102 making entry into the basement, heavy smoke”.
  • At 06:30:35, E109′s captain radioed, “Command from E109, contact 102,have them pull out of the first floor, redeploy to the back. It’s easy access. Conditions are changing at the front door.”
  • At 06:34:48, Engine 25 (E25), the designated Rapid Assistance Team, had just completed their 360-degree size-up around the building, and encountered E102’s Ffr. #2 in front of the building, whom reported that he had lost contact with his crew.
  • During the time period between 06:29:24 and 06:34:48, the investigation committee believed that one or more catastrophic events occurred including a failure of the main-level flooring system near the Beta – Charlie corner of the building.

 Rescue and Recovery Operations

  • At 06:35:34, the Incident Commander (IC) identified a potential Mayday operation, which indicates a life threatening situation to a firefighter.  
  • RAT25 was deployed at 06:36:48. The actual Mayday operation was initiated by the IC at 06:37:41 followed by a request at 06:37:53 to the HCCC for a second alarm complement of firefighting resources.  
  • At 06:42:01, RAT25 entered the basement from the rear of the building. At 07:00:27, E26’s personnel entered through the front main entrance of the building and into the basement by means of the interior stairway.  
  • Both missing firefighters were located in the basement near the Charlie side wall adjacent to the Beta side following a floor collapse. Capt. Broxterman and Ffr. Schira were obviously deceased as a result of their injuries. 

Fire Origin and Cause: Information from the property owners was that the female had smelled an odor in the house. She told her husband, who went to investigate. Neither of them observed any smoke or flames at that time. The husband went to the basement, and located a fire near a cedar wood lined closet used to cultivate orchids in the unfinished utility room. He attempted to extinguish the fire with portable fire extinguishers and pans of water. As the fire alarm activated, the husband had his wife call 9-1-1 to report the fire. The state of Ohio Fire Marshal’s Office Fire and Explosion Investigation Bureau ruled the fire to be accidental in nature. The fire was determined to have originated in the unfinished utility room of the basement level in or near the cedar closet. This area was directly below the family room on the first floor. The probable ignition source for this fire was determined to be at and about a plastic air circulation fan and the associated electrical wiring.

Cause of Deaths

Capt. Broxterman was a 37-year old employee of the Colerain Fire & EMS with approximately 17-years of certified firefighting experience. Capt. Broxterman became trapped in the basement area for a prolonged amount of time following the sudden floor collapse. Capt. Broxterman was found positioned face down over top of Ffr. Schira. The majority of her protective clothing ensemble and equipment were heavily damaged as a result of exposure to heat and direct flame impingement. She was pronounced deceased following her removal from the building. Her body was transported to the Hamilton County Coroner’s Office for autopsy. The Coroner’s report cited the manner of death as “accidental” and the cause of death as “burns and inhalation of smoke and superheated and noxious gases.” Capt. Broxterman sustained burns to 100% of her body surface, which ranged from first to fourth degree in severity as described in the coroner’s autopsy report. Postmortem carboxyhemoglobin (COHb), which is a measure of carbon monoxide exposure, was measured at 22% saturation and soot was observed in portions of her upper and lower respiratory system.

  • Based on the injuries sustained and the damage to Capt. Broxterman’s protective clothing ensemble and equipment, it is likely that she was exposed to a rapid intensification of heat and flames in the building’s basement that overwhelmed her protective ensemble and equipment, exposing her body and respiratory system to intense heat and toxic products of combustion.

 Ffr. Schira was a 29-year old employee of Colerain Fire & EMS with approximately 3½-years of certified firefighting experience. He also became trapped in the basement area for a prolonged amount of time following the sudden floor collapse. Ffr. Schira was found positioned on his right side and back, face-up beneath Capt. Broxterman. The majority of his protective clothing ensemble and equipment was heavily damaged as a result of exposure to heat and direct flame impingement. Ffr. Schira was pronounced deceased following his removal from the building. His body was transported to the Hamilton County Coroner’s Office for autopsy. The Coroner’s report cited the manner of death as “accidental” and the cause of death as “burns and inhalation of smoke and superheated and noxious gases”. Ffr. Schira sustained burns to 100% of his body surface, which ranged from first to fourth degree in severity as described in the coroner’s autopsy report. Postmortem COhb was measured at 8% saturation and soot was observed in portions of his upper and lower respiratory system.

  • Based on the injuries sustained and the damage to Ffr. Schira’s protective equipment, it is likely that that he was exposed to a rapid intensification of heat and flames in the building’s basement that overwhelmed his protective ensemble and equipment, exposing his body and respiratory system to intense heat and toxic products of combustion.

Select Findings and Recommendations

Findings, Discussions and Recommendations

FINDING #3.1: The area of fire origin had no finished ceiling, which exposed the floor joists and the underside of the floor decking to direct fire impingement causing rapid deterioration and failure of the flooring system directly underneath the main-level family room.

During this incident, based on communications transcripts (telephone and radio) it’s probable that the fire had advanced from its incipient stage to a free burning stage in approximately 18 to 20-minutes by the time Capt. Broxterman radioed that they were making entry into the basement.

  • As stated in the Incident Overview section, during the time period between 06:29:24 and 06:34:48, it is believed that one or more catastrophic events occurred within the building, which included a failure of the flooring system near the Beta-Charlie corner of the building’s first floor.

It has been widely believed in the firefighting profession that traditional sawn lumber is far superior to some of the more innovative lightweight construction components (e.g., wood I-joist) in use today. With dimensional lumber, two-inch by eight-inch and larger, there is a greater surface to mass ratio to resist the damaging effects of fire and the structural components will maintain their integrity for a longer period of time. While this has traditionally been accurate, this incident clearly shows that this may not always be the case. Heavy charring was evident to structural members in the fire area of origin. Notice the burn damage shows how the wooden floor joists had been burned to and away from the band joist. A band joist is a vertical member that forms the perimeter of a floor system in which the floor joists tie in to. Also known as the rim joist. Early platform framed homes very likely used solid, dimensional lumber and plywood, which provided a reasonable surface to mass ratio. But the later the home was built, the less mass even dimensional lumber has due to the reduction in the actual thickness of solid dimensional lumber provided by the lumber industry through the mid-1900’s. As the years go by, building materials will likely keep getting lighter and lighter and introduce more resins and other chemicals.

 Laboratory tests that exposed structural wood components to the American Society for Testing and Materials (ASTM) E119 Assembly Test indicated that a traditional two-inch by ten-inch structural member failed in 12-minutes and six-seconds. ASTM E119 test is the standard test method for evaluating building and construction materials exposed to fire. Unlike the standardized ASTM test fires, it is widely recognized that real building fires are highly variable in their size, rate of growth and intensity. Responding firefighters are unlikely to know when a given fire started, how hot it had been prior to arrival, how long it had been at any given temperature, the design capacity and actual loads on the floors over the fire or the amount of actual damage that the fire may have done to the joists. All of these factors make it impossible to predict the remaining capacity of a floor by even the most knowledgeable, professional fire experts.

RECOMMENDATION #3.1a: Fire departments should ensure that firefighters and incident commanders are aware that unprotected floor and ceiling joist systems, no matter the type, may fail at a faster rate when exposed to direct fire impingement.

Unfinished basement ceilings and other areas that have exposed joists or trusses jeopardize flooring and roof systems unnecessarily during a fire, causing premature failure. Often, a weakened floor and ceiling joist system can be difficult to detect from above as the floor surface above may still appear intact. Firefighters operating on floors above fire-damaged joist systems may fall through a weakened area and become trapped in a fire below. IC’s and firefighters must be aware that these systems can fail rapidly and without warning, and plan interior operations accordingly.

Firefighters must also be aware that while floor sag may be a widely accepted warning of an impending structural failure, floor sag is not always present or visible prior to a catastrophic collapse in a fire, regardless of the joist type, due to floor coverings, the fire’s intensity, the combination of joist spans and loads present, the location of serious structural fire damage or simply because it is too dark and smoky to see a sag in the floor. This is true for all types of structural joists, including materials such as sawn lumber, wood I-joists, and open web wood trusses and noncombustible members such as lightweight steel joists. The floor covering in this area was carpeting that transitioned to ceramic tile. When unprotected, any traditional or lightweight residential floor or ceiling assembly material, either combustible or noncombustible, may fail within several minutes of the fire’s ignition. It makes sense, therefore, that when there is a serious fire beneath a floor, there is no predictable safe amount of time that anyone can remain on that floor. Any floor system protected or not, can fail unpredictably when exposed to a substantial fire beneath.

FINDING # 4.2: E102′s officer failed to properly analyze the scene by not performing a 360-degree scene size-up to determine an overall strategy, and implement safe and effective firefighting tactics.

After the apparatus was positioned in front of the building, E102’s FAO was ordered by Capt. Broxterman to, “Ask the homeowner where the fire [location] was”, which was indicated to be in the basement by the male homeowner. As this was taking place, Capt. Broxterman continued donning her protective clothing ensemble (coat, helmet and self-contained breathing apparatus). Although E102′s officer provided a brief radio report of conditions observed upon arrival, she did not properly evaluate the scene so as to develop a basic strategy for implementation of safe and effective firefighting tactics. Had the officer visually evaluated the Charlie side of the building, the advanced fire conditions may have been noted, and that the lower level fire area was accessible by means of an exterior entry door for a more direct fire attack from the interior unburned side.

This means that firefighters enter a building and position the attack hose line between the fire and the uninvolved portions of the building. This direction of fire attack is preferred because it is likely to contain the fire, protect occupants, and push heat and gases out of the building if ventilation has been performed. On the other hand, danger increases significantly when attacking from the unburned side and is not always practical based on fire location, intensity, and building construction.

It cannot be conclusively known as to why Capt. Broxterman and Ffr. Schira proceeded into the area of the building that eventually collapsed resulting in their deaths. The investigation committee has concluded that the most probable explanation is that E102′s three-person interior team was successful in advancing their uncharged attack hose line into the basement recreation room area; reaching a point approximately 10 to15-feet from the bottom of the basement stairway as shown in the Incident Overview chapter. Once the team reached this area, it was realized they did not have sufficient hose line to continue advancing towards the seat of the fire. The team’s third member (Ffr. #2) reversed his travel and made his way back to the exterior of the building to advance additional hose line. As the team of two waited for additional hose line to be stretched and the hose line to be charged by the pump operator, the interior conditions rapidly deteriorated to a stage that it became untenable for them to hold their position.

The team evacuated back-up the stairway without following the hose line, which by all indications was tight up against the stairway wall and tightly wrapped around the stairway door entry. Once at the top of the stairway, one of the two deceased, if not both were likely in some form of distress; became disoriented and proceeded into the family room in a direction opposite the route of travel from which they entered the building. As the two moved across the family room floor, the flooring system collapsed into the utility room area of the basement. When the third team member re-entered the building, he was unable to locate the other two members.

The inability of Ffr. #2 to locate his team and the loss of radio communications contact with the interior team prompted the IC to declare a Mayday and activation of the RATs. This incident resulted in tragedy primarily due to the concealment of several burned-through floor joists under the carpet covered flooring system, which was nearly impossible to recognize due to heavy smoke conditions inside the burning building.

The following factors are believed to have directly contributed to the deaths that occurred in this incident:

  • The delayed arrival at the incident scene allowed the fire to progress significantly and the hazardous conditions to exponentially increase;
  • The failure to adhere to fundamental firefighting practices (e.g., entry into an enclosed building with obvious working fire conditions without a charged attack hose line)
  • The failure to abide by the fundamental concepts of fire fighter self-rescue and survival (e.g., following of the hose line in the direction of travel back to the building’s entrance or exit).

 Although the aforementioned factors are believed to have directly contributed to the deaths reported here, they might have been prevented if:

  • Some personnel had not been complacent or apathetic in their initial approach to this incident which eventually led to being overwhelmed in their response to their initial findings;
  • Some personnel were in a proper state of mind that made them more observant of their surroundings and indicators, and the potential threats and risks that presented themselves;
  • The initial responding units were provided with all pertinent information in a
  • timely manner relative to the incident, especially critical was the information  given to the emergency communications center from the homeowners reporting an actual fire
  • Personnel assigned to E102 possessed a comprehensive knowledge of their firstdue response area specifically related to road and street locations, and any particular characteristics related to those areas.
  • A 360-degree size-up of the building accompanied by a risk – benefit analysis was conducted by the company officer prior to initiating interior fire suppression operations; the risk of an action must be weighed against the probable benefit that may be reasonably and realistically expected.
  • Comprehensive standard operating guidelines specifically related to structural firefighting existed within the department;
  • The communications system users (on-scene firefighters and those monitoring the incident) weren’t all vying for limited radio air time. This competition led to missed and distorted messages and less than efficient use of resources, which exacerbated the problems of already taxed communications.
  • The communications equipment and accessories utilized were more appropriate for the firefighting environment;
  • Certain tactical-level decisions and actions were based on the specific conditions as encountered with an emphasis placed on fire ground tactical priorities (i.e., life safety, incident stabilization and property conservation);
  • Personnel had initiated fundamental measures to engage in if they were to become disoriented or trapped inside a burning building; and
  •  Issued personal protective equipment was utilized in the correct manner.

In Memory

The Colerain Township (OH) Department of Fire and Emergency Medical Services’s report examined the events of April 4th, 2008 with the benefit of hindsight, while seeking to be independent, impartial, and thorough. From the beginning, Colerain Fire & EMS has been committed to share our findings with others in the hope that it may prevent another such event.

The deaths of Captain Robin M. Broxterman and Firefighter Brian Schira had a profound loss not only to their parents, family and this organization, but also to the larger fire service community. In order to prevent these tragic losses in the future, we must first understand how and why our sister and brother firefighters died. We must learn from their incident and take that knowledge forward. If it was possible, what would these firefighters tell us today that might prevent a similar death of a firefighter in the future? What would they want us as firefighters, company officers and chief officers to know about the circumstances that lead to their deaths and the things we (and they) might have done to alter the most tragic of outcomes?  

From the information that was made available for review, it was evident that these two individuals were well-loved in life, and greatly missed in death. Every line of duty death of a firefighter in the United States is significant. This investigative analysis document is dedicated to Captain Broxterman and Firefighter Schira, their families, friends and the community whose lives were forever changed. In working to improve the health and safety of all United States firefighters, we have much to learn from the supreme sacrifice of these two individuals, who they were in life and in death. We honor their memories.

  

References

  • Colerain Township Department of Fire and Emergency Medical Services, Web Site HERE
  • Investigation Analysis of the Squirrels nest Lane Firefighter Line of Duty Deaths April, 2010 Full Report HERE
  • NIOSH Fire Fighter Fatality Investigation Report F2008-09| CDC/NIOSH July, 2009, Report HERE
  • WLTW.com news report Summary HERE

  

 

Buffalo, NY Three Alarm Fire and Double LODD Report

10 comments

8-26-2009 7-07-53 AMNIOSH released it’s report on the August 24, 2009 three alarm fire at 1815 Genesee Street in Buffalo, New York that resulted in the LODD of Lt. Charles McCarthy and FF Jonathan Croom. On August 24, 2009, 45-year-old career Lieutenant Charles McCarthy died following a partial floor collapse into a basement fire, and  34-year-old career fire fighter Jonathan Croom was fatally injured while attempting to rescue the Lieutenant.  The Buffalo Fire Department was dispatched for “an alarm of fire” with reported civilian(s) entrapment. Arriving units discovered a heavily secured mixed commercial/residential structure with smoke showing. Following failed initial attempts to locate an entry to the basement, crews located a door on Side 2 that provided access down a flight of stairs to a basement entry door. Repeated attempts were made to force open this basement door in order to search for trapped civilians, but crews had difficulty gaining access through this door because it was made of steel and locked and dead-bolted on both sides. Other crews on scene performed primary searches of the 1st and 2nd floors with no civilians found.

Approximately 30 minutes into the basement fire, command ordered all interior crews to exit the structure to regroup because crews were still unable to gain access into the basement from Side 2. Additional manpower was sent with special tools to assist in breaching the basement door on Side 2. Lieutenant Charles McCarthy and two fire fighters from his crew entered into the structure from Side 1 to verify all fire fighters had exited a 1st floor deli. Lt. McCarthy following a hoseline into the structure, was well ahead of the other two fire fighters when the 1st floor partially collapsed beneath him. McCarthy fell with the floor into the basement, exposing him to the basement fire. The other two fire fighters immediately exited the deli after fire conditions quickly changed and shelving and displays fell on them; they were unaware of what had just occurred. Lt. McCarthy made several Mayday calls from within the structure and activated his PASS device. Confusion erupted exteriorly on scene when trying to verify who was calling the Mayday, their exact location, and how they got into the basement.

The incident commander was aware that he had crews attempting to gain access into the basement from Side 2 but was unaware that there had been a floor collapse within the deli section of the structure. Simultaneously, FF Croom, a member of the fire fighter assistance and search team (FAST), was standing by outside  Lieutenant McCarthy’s point of entry when the Mayday calls came out. It is believed that FF Croom  knew where the Lt., was since he had gone in the structure with him earlier in the incident. FF Croom grabbed a tool, went on air, and rushed into the structure. The FAST and additional personnel on scene concentrated on Side 2 initially while other fire fighters followed an unmanned hoseline into the deli. Crews within the deli quickly discovered a floor collapse and reported hearing a PASS device alarming. Lt. McCarthy was immediately identified as missing during the first accountability check, but FF Croom was not accounted for as missing until the third accountability check, more than 50 minutes after Lt. McCarthy’s Mayday. After the fire was controlled, both victims were discovered side-by-side in the basement where the 1st floor had partially collapsed. They were found without their facepieces on and with SCBA bottles empty. the Lt’s. PASS device was still alarming. They were pronounced dead on scene. Four fire fighters and one lieutenant suffered minor injuries during the incident. No civilians were discovered within the structure.

Key contributing factors identified in this investigation include working above an uncontrolled, free-burning basement fire; interior condition reports not communicated to command; inadequate risk-versus-gain assessments; and, crew integrity not maintained.

NIOSH has concluded that, to minimize the risk of similar occurrences, fire departments should:

  • Ensure that all personnel are aware of the dangers of working above a fire, especially a basement fire, and develop, implement, and enforce a standard operating procedure (SOP) that addresses strategies and tactics for this type of fire.
  • Ensure that the incident commander (IC) receives interior status reports and performs/continues evaluating risk-versus-gain.
  • Ensure that crew integrity is maintained at all times on the fireground.
  • Ensure that the incident commander (IC) receives accurate personnel accountability reports (PAR) so that he can account for all personnel operating at an incident.
  • Ensure that a separate incident safety officer, independent from the incident commander, is appointed at each structure fire.
  • Ensure that fire fighters use their self-contained breathing apparatus (SCBA) and are trained in SCBA emergency procedures.
YouTube Preview Image

 YouTube Preview Image

1815 Genesee Street 1815 Genesee Street

CONTRIBUTING FACTORS 

Occupational injuries and fatalities are often the result of one or more contributing factors or key events in a larger sequence of events that ultimately result in the injury or fatality. NIOSH investigators identified the following items as key contributing factors in this incident that may have led to the fatalities:

  • Working above an uncontrolled, free-burning basement fire.
  • Interior condition reports not communicated to command.
  • Inadequate risk-versus-gain assessments.
  • Crew integrity not maintained.

Time Line from the Buffalo (NY) Fire Department Investigative Report

3:51 a.m. – fire crews were sent to 1815 Genesee Street in Buffalo. When they arrived, they were met by a resident who said he heard people trapped inside. Crews began searching the building, but were eventually ordered out as conditions deteriorated.

4:22 a.m. – Members of Rescue 1 entered the building to make sure all firefighters had evacuated the building. Less than two minutes later the floor in the rear of the building collapsed. Lt. McCarthy of Rescue 1 fell into the basement as the floor collapsed. according to the report, other members of Rescue 1 were unaware of the collapse and only reported hearing a loud noise. McCarthy began calling for help on his radio, but other members of Rescue 1 were unable to determine where the calls were coming from and left the building unaware that Lt. McCarthy was trapped.

4:23 a.m. – Firefighter Croom entered the building after hearing the calls for help. the report says he did not exit the building, apparently falling into the basement near Lt. McCarthy.

4:31 a.m. – An emergency head count was ordered to determine the identity of the missing firefighter. Lt. McCarthy was reported missing at that time, but FF Croom was not. Firefighters in the front of the store reported hearing a pass alarm, but could not reach it due to extreme fire conditions, a weakened floor and continuing collapse.

4:48 a.m. – all crews were ordered out of the building because it had become unsafe.

Later, concerns began to arise that FF Croom was missing. the report says he was erroneously reported in a remote area.

5:46 a.m. – On scene personal realize FF Croom is missing and likely inside the building.

6:10 a.m. – Another head count is taken and FF Croom is reported missing.

9:18 a.m. – the Recovery Group reports that the two missing firefighters had been located in the basement, covered in fallen debris.

9:32 a.m. – the debris is cleared and Recovery Group firefighters reach Lt. McCarthy and FF Croom.

Buffalo (NY) Fire Department Investigative Report, issued December 2, 2009, HERE

For a comprehensive Power Point Program on Operational Safety at Heavy Timber and Ordinary Construction Occupancys that you can down load, go to the National Firefighter Near Miss Reporting Web Site HERE.

I produced an informational training PPT program and support information that aligned with a previoulsy reported Near Miss Event Report. You can download the PPT Training Program HERE and the PDF File HERE

NIOSH Fire Fighter Fatality Investigative Report 2009-23, HERE